Roadmap - Creates one flow for each roadmap row?

%3CLINGO-SUB%20id%3D%22lingo-sub-3072868%22%20slang%3D%22en-US%22%3ERoadmap%20-%20Creates%20one%20flow%20for%20each%20roadmap%20row%3F%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-3072868%22%20slang%3D%22en-US%22%3E%3CP%3EI%20work%20with%20several%20roadmaps%20and%20connect%20them%20to%20different%20projects.%3C%2FP%3E%3CP%3EBut%20i%20get%20one%20Flow%20created%20on%20my%20account%20on%20each%20roadmap%20row%20i%20add.%3C%2FP%3E%3CP%3EIt%20is%20getting%20out%20of%20hand%20with%20way%20to%20many%20flows%20so%20i%20cant%20view%20my%20regular%20flows%20anymore.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EHow%20to%20manage%20these%20roadmap-flows%20that%20are%20created.%20Why%20do%20they%20need%20to%20be%20placed%20on%20my%20account%20together%20with%20all%20the%20other%20flows%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-LABS%20id%3D%22lingo-labs-3072868%22%20slang%3D%22en-US%22%3E%3CLINGO-LABEL%3EAdmin%3C%2FLINGO-LABEL%3E%3CLINGO-LABEL%3EDeveloper%3C%2FLINGO-LABEL%3E%3CLINGO-LABEL%3EProject%3C%2FLINGO-LABEL%3E%3C%2FLINGO-LABS%3E
Contributor

I work with several roadmaps and connect them to different projects.

But i get one Flow created on my account on each roadmap row i add.

It is getting out of hand with way to many flows so i cant view my regular flows anymore.

 

How to manage these roadmap-flows that are created. Why do they need to be placed on my account together with all the other flows?

2 Replies

Hello @oskarkuus ,

Unfortunately that is by design. The flows are created in the users account who connects that roadmap row with the project.

Paul

Thanks for the response.

I hope they rethink the design then.
I coordinate all roadmaps for all project leaders. And we have many of all.

These flows should be stored under another tab or be able to move to a group as owner instead.