Resources cost - By type and not by resource

%3CLINGO-SUB%20id%3D%22lingo-sub-1060683%22%20slang%3D%22en-US%22%3EResources%20cost%20-%20By%20type%20and%20not%20by%20resource%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1060683%22%20slang%3D%22en-US%22%3E%3CP%3EHi%2C%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EIt%20is%20possible%20to%20set%20the%20resource%20cost%20by%20type%20of%20user%20(I%20mean%2C%20each%20user%20rate%20will%20be%20like%20a%20product%20and%20each%20product%20will%20be%20related%20to%20N%20resources).%3C%2FP%3E%3CP%3EFor%20example%2C%20Jonh%20and%20Mary%20are%20Application%20Engineers%2C%20and%20their%20rate%20is%2070%24%2Fh.%20George%20and%20Anna%20are%20Managers%2C%20and%20their%20rate%20is%20100%24%2Fh.%20So%2C%20instead%20of%20setting%204%20times%20the%20resource%20rate%20(1%20per%20resource)%20I%20want%20to%20set%202%20times%20(1%20by%20type%20of%20resource)%20and%20then%20I%20say%20that%20Jonh%20is%20an%20Application%20Engineer%2C%20etc.%3C%2FP%3E%3CP%3EIs%20this%20possible%20using%20Project%20Online%3F%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EThanks.%3C%2FP%3E%3C%2FLINGO-BODY%3E
Frequent Visitor

Hi,

 

It is possible to set the resource cost by type of user (I mean, each user rate will be like a product and each product will be related to N resources).

For example, Jonh and Mary are Application Engineers, and their rate is 70$/h. George and Anna are Managers, and their rate is 100$/h. So, instead of setting 4 times the resource rate (1 per resource) I want to set 2 times (1 by type of resource) and then I say that Jonh is an Application Engineer, etc.

Is this possible using Project Online?

 

Thanks.