Project Server PWA project change task order

%3CLINGO-SUB%20id%3D%22lingo-sub-2189537%22%20slang%3D%22en-US%22%3EProject%20Server%20PWA%20project%20change%20task%20order%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2189537%22%20slang%3D%22en-US%22%3E%3CP%3EHello%20Everyone%2C%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EI%20want%20to%20change%20the%20task%20order%20in%20the%20Project%20Server%20for%20PWA%20Enterprise%20Project%20type%20in%20a%20similar%20way%20to%20move%20tasks%20up%20and%20down%20in%26nbsp%3BSharepoint%20Tasks%20List%20and%20Project%20Online.%20Is%20it%20possible%20to%20do%20so%3F%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EThanks%20%26amp%3B%20Regards%2C%3C%2FP%3E%3CP%3ERohan%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-LABS%20id%3D%22lingo-labs-2189537%22%20slang%3D%22en-US%22%3E%3CLINGO-LABEL%3EProject%20Server%3C%2FLINGO-LABEL%3E%3C%2FLINGO-LABS%3E
Contributor

Hello Everyone,

 

I want to change the task order in the Project Server for PWA Enterprise Project type in a similar way to move tasks up and down in Sharepoint Tasks List and Project Online. Is it possible to do so?

For example,

 

task example.png

 

 

 

Thanks & Regards,

Rohan

1 Reply
Rohan -- Open the project in either Microsoft Project or in Project Web App, and then use "drag and drop" to move the tasks into the desired order. To use "drag and drop, click the row header of the task you want to move, then release your mouse button. Then click and hold the row header to "grab" the selected task row, then drag it to its new location and release the mouse button to drop it. Hope this helps.