Nov 16 2023 03:22 PM
Opening an existing Project plan resulted in all of the predecessors being incorrect. I don't enter Predecessor data in the higher level tasks yet all of those were populated with random values. The original entries were changed, in some cases, strings of ~5 - 10 predecessors were repeated. Others were simply just wrong values. Also, the slider all of the way on the right does not move when scrolling.
I have copy/pasted the data into a new Project file and now all of the predecessors have moved down one place.
It is not a large file, 361 tasks, however, the copied version is 720KB and the original file is 55MB. It appears to be corrupted. Earlier in the day, I had an Excel file open that started to pop up an error of "Not enough resources to complete the function" or words to that effect which I have not seen before with that file. Indication of a more broad issue.
Thoughts?
MS Project
MS 365
Version 2310 Build 16924.20124 click-to-Run
PC
Windows 11 v21H2
Processor: 11th Gen Intel(R) Core(TM) i7-11800H @ 2.30GHz 2.30 GHz
RAM: 32.0 GB (31.7 GB usable)
Nov 17 2023 01:07 PM
Nov 22 2023 06:41 AM
Thank yo for the response. I did have the (work) laptop checked for viruses, had the hardware checked out and had 365 and Project reinstalled to no avail - no viruses. I also tried your method of saving it as an XML and back to Project but a warning pops up when I try to open the most recent version which says words to the effect of, "You sure you want to open this file as it caused serious errors the last time it was opened". I ended up selected a very dated version that works that saves me about 2 hours but leaves another 2 - 3 hours of work, I won't complain. Concerned there is a problem still lurking but nothing I can do at this point.
Again, thanks.
Nov 22 2023 07:34 AM