No Sync from Sharepoint online task list to project 2019

%3CLINGO-SUB%20id%3D%22lingo-sub-1393773%22%20slang%3D%22fr-FR%22%3ENo%20Sync%20from%20Sharepoint%20online%20task%20list%20to%20project%202019%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1393773%22%20slang%3D%22fr-FR%22%3E%3CP%3EHello%20I'm%20new%20here.%3C%2FP%3E%3CP%3EI%20managed%20OK%20to%20save%20from%20a%20project%20to%20a%20sharepoint%20online%20task%20list%20but%20at%20reverse%20I'm%20going%20crazy.%20I%20tried%20to%20change%20some%20values%20in%20the%20task%20list%20and%20open%20after%20the%20project%20-%20KO%2C%20I%20tried%20to%20change%20values%20when%20the%20project%20is%20open...%20KO%20.%20Nothing%20go%20through.%20However%20I%20well%20managed%20my%20mapping.%3C%2FP%3E%3CP%3E1-%20I%20see%20in%20the%20task%20beds%20all%20the%20fields%20I%20mapped%3C%2FP%3E%3CP%3E2-%20I%20created%20my%20empty%20project%20from%20an%20empty%20task%20list%3C%2FP%3E%3CP%3E4-%20I%20mapped%20mainly%20the%20fields%20WORK%2C%20in%20french.%20When%20I%20change%20Work%20Remaining%20(%22WORK%20TO%20DO%22)%20in%20the%20task%20list%20for%20instance%2C%20nothing%20happens%20in%20Project.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3ESo%20I%20don't%20know%20what%20to%20do..%3C%2FP%3E%3CP%3ENeed%20help%20I%20think.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-inline%22%20image-alt%3D%22Powerbi.png%22%20style%3D%22width%3A%20999px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F192126i60E588AD973E2FCC%2Fimage-size%2Flarge%3Fv%3D1.0%26amp%3Bpx%3D999%22%20title%3D%22Powerbi.png%22%20alt%3D%22Powerbi.png%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%3C%2FLINGO-BODY%3E
Highlighted
New Contributor

Hello I'm new here.

I managed OK to save from a project to a sharepoint online task list but at reverse I'm going crazy. I tried to change some values in the task list and open after the project => KO, I tried to change values when the project is open... =>KO . Nothing go through. However I well managed my mapping.

1- I see in the task lits all the fields I mapped

2- I created my empty project from an empty task list

4- I mapped mainly the fields WORK, in french (Travail de référence, Travail Restant). When I change Travail Restant ("WORK TO DO") in the task list for instance, nothing happens in Project.

 

So I don't know what to do..

Need help I think.

 