Change the group assigned to a project for the web?

%3CLINGO-SUB%20id%3D%22lingo-sub-1423821%22%20slang%3D%22en-US%22%3EChange%20the%20group%20assigned%20to%20a%20project%20for%20the%20web%3F%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1423821%22%20slang%3D%22en-US%22%3E%3CP%3EHi%20everyone!%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EI%20was%20wondering%20how%20can%20I%20change%20the%20group%20that%20I%20previously%20assign%20to%20the%20project.%20I%20assign%20the%20project%20incorrectly.%26nbsp%3B%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3Ethanks%20in%20advance.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-LABS%20id%3D%22lingo-labs-1423821%22%20slang%3D%22en-US%22%3E%3CLINGO-LABEL%3EProject%3C%2FLINGO-LABEL%3E%3CLINGO-LABEL%3Eshare%3C%2FLINGO-LABEL%3E%3CLINGO-LABEL%3EWeb%3C%2FLINGO-LABEL%3E%3C%2FLINGO-LABS%3E
Occasional Contributor

Hi everyone!

 

I was wondering how can I change the group that I previously assign to the project. I assign the project incorrectly. 

 

thanks in advance.

1 Reply

@gteibo1  I'm having same problem.  Did you get an answer from anyone else?  Thx.