Change the group assigned to a project for the web?

Copper Contributor

Hi everyone!

 

I was wondering how can I change the group that I previously assign to the project. I assign the project incorrectly. 

 

thanks in advance.

2 Replies

@gteibo1  I'm having same problem.  Did you get an answer from anyone else?  Thx.

@JerryHendrickson 

I've had the same problem, you can only copy the project in project for the web, assign the copy to the correct group and then delete the original.