Jan 19 2022 11:10 PM
1. Fechcing Simulator interface status never ends, even after 2 hours while creating brain (Managed Simulator)- ACR uploaded image -
2. Simulator created in Bonsai UI. but could not create the Brain( connecting the ACR uploaded simulator)
2. Simulator created in python using Cartpole example SDK3 - template
3. With the same code unmanaged Simulator works well in local machine. and Training progress executes well
4. Tried with 2 different accounts in 2 different machine. the result is same.(fetching simulator interface)
5. no error codes with inkling file
6. no error code in the Bonsai UI interface
Please suggest how to troubleshoot, what is happening with Brain-agent
Jan 22 2022 09:00 PM