Jun 07 2021 07:47 AM
Hi there,
When attempting to start training through the web interface I find that it will fail to connect to simulator and eventually fail. I also sometimes get an error message 'Restoring the checkpoint failed because the tensorflow graph in the checkpoint does not match the the one that the brain created'. I don't know if the second part is related to the fact I do not get a new version of the brain created when I start training (which is expected based on the changes to the inkling from the previous version). Any ideas on what the issue might be?
Thanks,
David
Jun 07 2021 09:06 AM
Jun 07 2021 09:49 AM
Hi Ali,
Here's the URL https://preview.bons.ai/workspaces/c0886a7d-0dff-4913-ac03-0817b53e93c0/brains/DD_EnzymeReactor/vers...
I created a new brain with the same inkling and was able to get training so some kind of issue with this specific one I guess?
Thanks,
David