%3CLINGO-SUB%20id%3D%22lingo-sub-268466%22%20slang%3D%22en-US%22%3EAnnouncing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-268466%22%20slang%3D%22en-US%22%3E%3CP%3EOn%20September%2024%3CSUP%3Eth%3C%2FSUP%3E%20at%20Microsoft%20Ignite%2C%20we%20announced%20a%20new%20feature%20for%20Microsoft%20Project%20called%20Roadmap.%20Roadmap%20is%20a%20visually%20exciting%20way%20to%20combine%20information%20from%20multiple%20Waterfall%20and%20Agile%20projects%20and%20share%20it%20with%20co-workers.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3ERoadmaps%20are%20available%20directly%20on%20the%20new%20Project%20Home%20page%20that%20we%20released%20into%20production%20this%20Summer.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3ECheck%20it%20out%20at%20%3CA%20href%3D%22https%3A%2F%2Fproject.microsoft.com%22%20target%3D%22_self%22%20rel%3D%22noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%22%3Eproject.microsoft.com%3C%2FA%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-center%22%20style%3D%22width%3A%20999px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F55800i4EC0E4CBCA3A1CF6%2Fimage-size%2Flarge%3Fv%3D1.0%26amp%3Bpx%3D999%22%20alt%3D%22home.PNG%22%20title%3D%22home.PNG%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EThey%20are%20easily%20created%20from%20the%20Project%20Home%20page%20and%20appear%20nearly%20instantly.%20Performance%20has%20been%20an%20important%20tenet%20of%20the%20Roadmap%20feature%3C%2FP%3E%0A%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-center%22%20style%3D%22width%3A%20256px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F55803iC82648B89000F5CD%2Fimage-size%2Flarge%3Fv%3D1.0%26amp%3Bpx%3D999%22%20alt%3D%22new.PNG%22%20title%3D%22new.PNG%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EOnce%20the%20Roadmap%20is%20completed%2C%20it%20provides%20a%20visual%20and%20interactive%20way%20to%20view%20project%20status%20across%20a%20program%20or%20portfolio.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-center%22%20style%3D%22width%3A%20999px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F55806iBDB1E7545129E62B%2Fimage-size%2Flarge%3Fv%3D1.0%26amp%3Bpx%3D999%22%20alt%3D%22Roadmap.PNG%22%20title%3D%22Roadmap.PNG%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EBuilding%20out%20a%20Roadmap%20is%20a%20fairly%20simple%20process.%20Merely%20add%20rows%2C%20connect%20them%20to%20projects%20and%20then%20choose%20what%20tasks%2C%20milestones%2C%20features%20or%20initiatives%20you%20want%20to%20bubble%20up%20to%20the%20Roadmap.%20After%20creating%20a%20row%2C%20pick%20a%20project%20type%20first.%20In%20our%20initial%20release%2C%20we%20will%20support%20Project%20Online%20projects%20and%20Azure%20Boards%20projects.%20Over%20time%20we%20will%20add%20different%20project%20types%20as%20we%20better%20understand%20what%20customer%E2%80%99s%20needs.%20We%20use%20the%20Microsoft%20Flow%20connector%20infrastructure%20for%20our%20project%20types%2C%20so%20it%20is%20a%20very%20powerful%20and%20flexible%20connection%20system.%3C%2FP%3E%0A%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-center%22%20style%3D%22width%3A%20356px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F55807iBC7B1601D78BA7D3%2Fimage-size%2Flarge%3Fv%3D1.0%26amp%3Bpx%3D999%22%20alt%3D%22new%20row.PNG%22%20title%3D%22new%20row.PNG%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EAfter%20choosing%20a%20project%20type%2C%20the%20user%20chooses%20a%20project%20and%20signs%20into%20that%20project.%20Microsoft%20Flow%20manages%20all%20the%20credentials%20in%20a%20compliant%20way.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-center%22%20style%3D%22width%3A%20654px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F55808i9BF36B4EE7E9F936%2Fimage-size%2Flarge%3Fv%3D1.0%26amp%3Bpx%3D999%22%20alt%3D%22connect%20using%20flow.PNG%22%20title%3D%22connect%20using%20flow.PNG%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EOnce%20the%20tasks%20are%20on%20the%20Roadmap%2C%20they%20can%20be%20assigned%20a%20status%20by%20the%20Roadmap%20manager.%20This%20is%20independent%20of%20the%20backend%20project%20and%20can%20be%20managed%20by%20the%20roadmap%20owner%20for%20reporting.%3C%2FP%3E%0A%3CP%3EAfter%20that%2C%20its%20merely%20a%20matter%20of%20choosing%20what%20tasks%20to%20show%20on%20the%20roadmap.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-center%22%20style%3D%22width%3A%20426px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F55812iE023C554B062D9E1%2Fimage-size%2Flarge%3Fv%3D1.0%26amp%3Bpx%3D999%22%20alt%3D%22set%20status.PNG%22%20title%3D%22set%20status.PNG%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EIf%20a%20task%20is%20marked%20as%20at%20risk%2C%20a%20user%20might%20need%20to%20drill%20through%20to%20the%20backing%20task%20in%20the%20original%20system.%20The%20Roadmap%20maintains%20a%20link%20to%20the%20original%20task%20so%20users%20can%20always%20click%20through%20to%20the%20%E2%80%98system%20of%20record%E2%80%99.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-center%22%20style%3D%22width%3A%20339px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F55809iA92664EEE7288B72%2Fimage-size%2Flarge%3Fv%3D1.0%26amp%3Bpx%3D999%22%20alt%3D%22details.PNG%22%20title%3D%22details.PNG%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EIn%20addition%20to%20including%20tasks%20from%20back%20end%20systems%2C%20users%20may%20also%20add%20Key%20Dates%20to%20the%20Roadmap.%20These%20dates%20show%20up%20at%20the%20top%20of%20the%20roadmap%20and%20provide%20a%20visualization%20of%20important%20dates%20that%20span%20across%20projects%20%E2%80%93%20like%20a%20launch%20date%20or%20big%20marketing%20event.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-center%22%20style%3D%22width%3A%20309px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F55810iFE28DBF3E44D87D2%2Fimage-size%2Flarge%3Fv%3D1.0%26amp%3Bpx%3D999%22%20alt%3D%22keydate.PNG%22%20title%3D%22keydate.PNG%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EFinally%2C%20after%20the%20Roadmap%20has%20been%20completed%2C%20the%20author%20will%20want%20to%20share%20the%20roadmap.%20Roadmaps%20are%20shared%20using%20Office%20Modern%20Groups.%20Once%20a%20roadmap%20is%20shared%20a%20Modern%20Group%20is%20created%20to%20back%20the%20Roadmap%20and%20provide%20additional%20collaborative%20capabilities.%20A%20user%20can%20also%20choose%20to%20share%20the%20roadmap%20with%20an%20existing%20Modern%20Group%20that%20they%20might%20be%20working%20with.%3C%2FP%3E%0A%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-center%22%20style%3D%22width%3A%20313px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F55811i34D6324D18A0AD6B%2Fimage-size%2Flarge%3Fv%3D1.0%26amp%3Bpx%3D999%22%20alt%3D%22Group.PNG%22%20title%3D%22Group.PNG%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EThat%20is%20a%20brief%20overview%20of%20the%20new%20Project%20Roadmap%20feature.%20We%20will%20be%20releasing%20the%20feature%20to%20our%20early%20adopter%20program%20shortly.%20When%20we%20all%20agree%20its%20ready%20for%20all%20our%20customers%2C%20we%20will%20begin%20rolling%20it%20out%20to%20the%20rest%20of%20our%20Project%20Online%20customers.%20Keep%20an%20eye%20out%20for%20the%20new%20Roadmap!%3C%2FP%3E%0A%3CP%3ECheers%2C%3C%2FP%3E%0A%3CP%3EHoward%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-TEASER%20id%3D%22lingo-teaser-268466%22%20slang%3D%22en-US%22%3E%3CP%3E%3CSPAN%3EOn%20September%2024%3C%2FSPAN%3E%3CSUP%3Eth%3C%2FSUP%3E%3CSPAN%3E%26nbsp%3Bat%20Microsoft%20Ignite%2C%20we%20announced%20a%20new%20feature%20for%20Microsoft%20Project%20called%20the%20Roadmap.%20Roadmap%20is%20a%20visually%20exciting%20way%20to%20combine%20information%20from%20multiple%20Waterfall%20and%20Agile%20projects%20and%20share%20it%20with%20co-workers.%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-center%22%20style%3D%22width%3A%20999px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F55813i605F77F2CE43493F%2Fimage-size%2Flarge%3Fv%3D1.0%26amp%3Bpx%3D999%22%20alt%3D%22Roadmap.PNG%22%20title%3D%22Roadmap.PNG%22%20%2F%3E%3C%2FSPAN%3E%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-TEASER%3E%3CLINGO-LABS%20id%3D%22lingo-labs-268466%22%20slang%3D%22en-US%22%3E%3CLINGO-LABEL%3EOffice%20365%3C%2FLINGO-LABEL%3E%3CLINGO-LABEL%3EProject%20Online%3C%2FLINGO-LABEL%3E%3C%2FLINGO-LABS%3E%3CLINGO-SUB%20id%3D%22lingo-sub-366700%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-366700%22%20slang%3D%22en-US%22%3E%3CP%3EThanks%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3E%20that's%20good%20to%20know.%3CBR%20%2F%3E%3CBR%20%2F%3EAdrian.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-364408%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-364408%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F4635%22%20target%3D%22_blank%22%3E%40Adrian%20Mannall%3C%2FA%3E%26nbsp%3BAdrian%20-%20EDU%20tenants%20will%20be%20getting%20Roadmap%20in%20Mid-April%2C%20thanks%20for%20your%20patience.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-364018%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-364018%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F4635%22%20target%3D%22_blank%22%3E%40Adrian%20Mannall%3C%2FA%3E%26nbsp%3BPM%20me%20your%20tenant%20URL%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-363997%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-363997%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3EWe%20are%20an%20Education%20tenant%20in%20Europe%20Production%20Zone%20and%20so%20far%20we%20have%20no%20Project%20settings%20in%20our%20Admin%20centre.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EWe%20have%202%2C000%20Project%20Essentials%20licenses%2C%20150%20Project%20Online%20with%20Project%20Pro%20and%2025%20Project%20Online%20with%20Project%20Premium%20licenses.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EAny%20ideas%20why%20this%20isn't%20available%20to%20us%20yet%3F%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EThanks%3C%2FP%3E%3CP%3EAdrian%3C%2FP%3E%3CBLOCKQUOTE%3E%3CHR%20%2F%3E%3C%2FBLOCKQUOTE%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-331584%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-331584%22%20slang%3D%22en-US%22%3E%3CP%3EGreat%20with%20the%20new%20Roadmap%20functionality%20but%20a%20few%20questions%3A%3C%2FP%3E%3CUL%3E%3CLI%3ECan%20I%20get%20an%20overview%20of%20all%20roadmaps%20created%20in%20a%20tenant%3F%20On%20the%20Home%20site%20I%20only%20see%20the%20latest%2Fshared%20by%20me%2Fcreated%20by%20me%20or%20the%20ones%20that%20I%20have%20marked%20as%20favorites.%3C%2FLI%3E%3CLI%3EI%20have%20noticed%20that%20if%26nbsp%3B%20the%20name%20of%20an%20activity%20in%20Project%20Online%20is%20changed%20the%20name%20of%20the%20item%20in%20the%20Roadmap%20does%20not%20change.%20Is%20this%20by%20design%20or%20will%20this%20be%20fixed%3F%3C%2FLI%3E%3CLI%3EI%20have%20also%20noticed%20that%20if%20the%20end%20date%20of%20an%20activity%20changes%2C%20and%20the%20project%20is%20published%2C%20that%20change%20is%20reflected%20in%20the%20roadmap%20after%20a%20while%20but%20not%20directly.%20How%20long%20should%20you%20expect%20to%20wait%20there%3F%3C%2FLI%3E%3C%2FUL%3E%3CP%3EBest%20regards%3C%2FP%3E%3CP%3EJohan%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-326231%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-326231%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3E%26nbsp%3B%20and%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F68%22%20target%3D%22_blank%22%3E%40Brian%20Smith%3C%2FA%3E%26nbsp%3B%2C%3C%2FP%3E%3CP%3EThank%20you%20both%20for%20your%20time%20and%20efforts.%20We%20were%20finally%20able%20to%20turn%20on%20Roadmap%20for%20our%20organization.%20Had%20to%20go%20through%20the%20upgrade%20of%20the%20Default%20environment%20twice%20for%20some%20reason.%3C%2FP%3E%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-inline%22%20style%3D%22width%3A%20645px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F71075iBE9457637E2A48AE%2Fimage-size%2Flarge%3Fv%3D1.0%26amp%3Bpx%3D999%22%20alt%3D%22roadmapenabled.PNG%22%20title%3D%22roadmapenabled.PNG%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-325696%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-325696%22%20slang%3D%22en-US%22%3E%3CP%3EI%20thought%20Roadmaps%20was%20going%20to%20be%20part%20of%20O365%20Planner%2C%20or%20has%20this%20changed%20now%3F%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EWe%20have%20MS%20Project%20Online%20licenses%20and%20I've%20activated%20Roadmaps%20and%20then%20tried%20to%20use%20them.%20Not%20much%20success%2C%20and%20not%20impressive.%20I%20tried%20to%20link%20a%20row%20to%20a%20DevOps%20project%20and%20it%20couldn't%20find%20the%20line%20items%20I'd%20added.%20Also%2C%20it's%20just%20not%20intuitive%20and%20where's%20the%20training%20for%20it%3F%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3ESorry%20to%20this%20has%20been%20implemented%20as%20it%20has%2C%20it%20seems%20like%20WIP%20still.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-325066%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-325066%22%20slang%3D%22en-US%22%3E%3CP%3EHi%20Petr%2C%20thanks%20for%20the%20feedback.%26nbsp%3B%20To%20the%20point%20on%20adding%20multiple%20items%20to%20the%20row%2C%20you%20can%20now%20do%20this%20from%20inside%20of%20Project%20Web%20App%20-%20by%20selecting%20multiple%20tasks%20and%20then%20using%20the%20Add%20to%20Roadmap%20option%2C%26nbsp%3B%20This%20would%20be%20for%20a%20plan%20that%20was%20already%20associated%20with%20a%20row.%26nbsp%3B%20Still%20a%20bottom%20up%20approach%20though%20and%20I%20do%20understand%20where%20you%20are%20coming%20from%20on%20that%20point.%3C%2FP%3E%0A%3CP%3EPlease%20also%20share%20your%20views%20on%20UserVoice%26nbsp%3B%3CFONT%20style%3D%22background-color%3A%20%23ffffff%3B%22%3E%3CA%20href%3D%22https%3A%2F%2Fmicrosoftproject.uservoice.com%2Fforums%2F914203-project-home%22%20target%3D%22_blank%22%20rel%3D%22noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%22%3Ehttps%3A%2F%2Fmicrosoftproject.uservoice.com%2Fforums%2F914203-project-home%3C%2FA%3E%3C%2FFONT%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-inline%22%20style%3D%22width%3A%20991px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F70840i93CF8F6DE41BAEE1%2Fimage-size%2Flarge%3Fv%3D1.0%26amp%3Bpx%3D999%22%20alt%3D%22AddToRoadmap.JPG%22%20title%3D%22AddToRoadmap.JPG%22%20%2F%3E%3CSPAN%20class%3D%22lia-inline-image-caption%22%20onclick%3D%22event.preventDefault()%3B%22%3EAdd%20to%20Roadmap%20screenshot%20showing%20adding%20rows%3C%2FSPAN%3E%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3EBest%20regards%2C%3C%2FP%3E%0A%3CP%3EBrian%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-324925%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-324925%22%20slang%3D%22en-US%22%3E%3CP%3EI%20can%20agree%20with%20%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F1081%22%20target%3D%22_blank%22%3E%40Ivan%20Unger%3C%2FA%3E%20here.%20I%20don't%20want%20to%20say%2C%20I%20am%20disappointed%2C%20maybe%20just%20confused.%20So%20here%20is%20my%20take%3A%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3E-%20Licensing%20Roadmaps%20via%20Project%2C%20is%20a%20bummer%20imo.%20We%20have%20expected%20Roadmaps%20becoming%20a%20separate%20tile%20amongst%20other%20O365%20apps%2C%20licensed%20completly%20separately.%3C%2FP%3E%3CP%3E-%20From%20what%20I%20remember%2C%20Roadmaps%20were%20supposed%20to%20work%20also%20with%20the%20Planner.%20So%20why%20is%20the%20Project%20license%20required%3F%20Or%20did%20the%20scope%20of%20the%20project%20changed%20and%20Planner%20integration%20is%20not%20planned%20anymore%3F%3C%2FP%3E%3CP%3E-%20There%20is%20recently%20no%20ability%20to%20have%20a%20standalone%20row%2C%20which%20is%20not%20connected%20to%20either%20the%20Project%2C%20or%20the%20Azure%20Boards.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3ENow%20to%20Roadmaps%20itself%3A%3C%2FP%3E%3CP%3E-%20The%20work%20with%20the%20app%20is%20kind%20of%20cumbersome.%20If%20you%20want%20to%20add%20a%20project%20with%20its%20subtasks%2C%20you%20have%20to%20add%20each%20subtask%20manually%2C%20one%20by%20one.%3C%2FP%3E%3CP%3E-%20If%20your%20Project%20multiple%20projects%20carry%20something%20like%20%22Phase%20one%20-%20planning%22%2C%20you%20can't%20distinguish%2C%20whish%20is%20which.%3C%2FP%3E%3CP%3E-%20You%20can't%20see%20a%20list%20of%20tasks%20%2F%20subtasks%2C%20from%20the%20connected%20Project.%20You%20have%20to%20guess%2C%20what%20is%20in%20there%20and%20start%20to%20type%20some%20letters%2C%20in%20order%20to%20see%2C%20if%20any%20such%20task%2Fsubtask%20exists.%3C%2FP%3E%3CP%3E-%20You%20can't%20recolor%20tasks.%20The%20coloring%20is%20based%20upon%20the%20Roadmap%20status%20only.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EYou%20can%20consider%20some%20of%20above%20points%20as%20a%20mayor%20usability%20issue%20imo.%20As%20for%20us%2C%20that%20app%20is%20so%20basic%2C%20that%20we%20are%20not%20sure%20yet%2C%20if%20it%20is%20worth%20the%20hassle.%20Looking%20forward%20to%20what%20the%20future%20brings%20here%20though%20....%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3ECheers%2C%3C%2FP%3E%3CP%3E%2FPetr%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-324911%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-324911%22%20slang%3D%22en-US%22%3EHi%2C%20THis%20rolled%20out%20too%20my%20organisation%20yesterday%20and%20it's%20great%20however%20all%20the%20dates%20are%20in%20US%20format%20when%20you%20drill%20in%20to%20the%20tasks.%20Can%20we%20set%20them%20to%20UK%20and%20if%20not%20yet%2C%20will%20we%20be%20able%20to%20later%3F%20Thanks.%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-324825%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-324825%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3E%26nbsp%3Bthat's%20good%20news.%20I%20was%20just%20wondering%20because%20the%20Azure%20Board%20selector%20neither%20lets%20me%20change%20the%3C%2FP%3E%3CDIV%20class%3D%22roadmap-row-connection-pane-panel-body-section-title%22%3EAzure%20DevOps%20organization%20nor%20can%20I%20provide%20a%20custom%20URL.%3C%2FDIV%3E%3CDIV%20class%3D%22roadmap-row-connection-pane-panel-body-section-title%22%3E%26nbsp%3B%3C%2FDIV%3E%3CDIV%20class%3D%22roadmap-row-connection-pane-panel-body-section-title%22%3EMaybe%20I%20first%20have%20to%20create%20a%20connection%20to%20my%20default%20Azure%20DevOps%20organization%20and%20then%20change%20it%20to%20the%20customers%20organization%20within%20Flow.%26nbsp%3B%3C%2FDIV%3E%3CDIV%20class%3D%22project-url-autocomplete-box-section%22%3E%3CDIV%20class%3D%22ms-ComboBox-container%20project-url-autocomplete-box%20%22%3E%3CDIV%20class%3D%22ms-ComboBox%20css-189%22%3E%26nbsp%3B%3C%2FDIV%3E%3C%2FDIV%3E%3C%2FDIV%3E%3CDIV%20class%3D%22success-or-error-section%22%3E%26nbsp%3B%3C%2FDIV%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-324812%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-324812%22%20slang%3D%22en-US%22%3E%3CP%3EOne%20input%20I%20can%20give%20is%20that%20you%20need%20the%20separate%20power%20apps%20license%20to%20upgrade%20your%20cds%20environment.%20I've%20noticed%20that%20M365%20E5%20is%20not%20enough%2C%20as%20the%20PowerAdmin%20Center%20is%20full%20of%20holes%20without%20the%20separate%20license.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EHere%20is%20my%20general%20feedback%20after%20first%20use.%20We%20wanted%20to%20use%20the%20roadmap%20feature%20to%20visualize%20our%20big%20company%20wide%20projects%20for%20the%20next%204%20years.%3C%2FP%3E%3CP%3ETurns%20out%20we%20can't%2C%20as%20we'd%20first%20have%20to%20create%20ALL%20the%20projects%20with%20ALL%20the%20tasks%20we%20want%20to%20%22bubble%20up%22%20in%20Project%20Online%20first%2C%20as%20we%20got%20none%20of%20those.%20Adding%20rows%20without%20a%20connection%20an%20actual%20project%20is%20also%20useless.%20It's%20just%20a%20row%20with%20a%20name%2C%20not%20tasks%20in%20it.%3C%2FP%3E%3CP%3EAlso%20of%20note%2C%20as%20it%20wasn't%20immediately%20clear%20to%20me.%20You%20can't%20change%20the%20date%20of%20those%20roadmap%20tasks%2C%20they%20are%20linked%20to%20the%20actual%20task%20dates%20from%20the%20project.%20You%20can%20only%20change%20the%20status.%20Also%20make%20sure%20to%20properly%20publish%20your%20project%2C%20otherwise%20you%20won't%20be%20able%20to%20link%20those%20tasks%20in%20the%20roadmap.%3C%2FP%3E%3CP%3EBasically%20Roadmap%20requires%20a%20bottom%20up%20approach%20where%20to%20have%20to%20have%20everything%20planned%20before%20you%20can%20create%20a%20roadmap.%20I'm%20no%20project%2Froadmap%20expert%20but%20I%20would%20have%20expected%20it%20to%20be%20the%20other%20way%20around%2C%20say%20make%20a%20rough%20roadmap%20and%20then%20start%20planning%20everything%20in%20detail.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-324758%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-324758%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F270840%22%20target%3D%22_blank%22%3E%40DanielWeise%3C%2FA%3E%26nbsp%3Bwe%20use%20Flow%20under%20the%20covers%20-%20so%20if%20you%20can%20connect%20a%20Flow%20to%20it%2C%20the%20answer%20is%20yes.%20It%20depends%20a%20little%20bit%20on%20the%20Auth%20setup%20of%20the%20target%20-%20but%20mostly%20yes.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-324637%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-324637%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F29345%22%20target%3D%22_blank%22%3E%40Sean%20Decker%3C%2FA%3E%26nbsp%3B%20We%20made%20a%20video%20to%20help%20with%20your%20particular%20case...I%20hope%20this%20helps!!!%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2FProject-Blog%2FHow-to-Upgrade-your-CDS-instance-for-Project-Roadmap%2Fba-p%2F324631%22%20target%3D%22_self%22%3Ehttps%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2FProject-Blog%2FHow-to-Upgrade-your-CDS-instance-for-Project-Roadmap%2Fba-p%2F324631%3C%2FA%3E%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-324633%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-324633%22%20slang%3D%22en-US%22%3E%3CP%3ENow%20it's%20available%2C%20great!%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EWill%20there%20be%20a%20possibility%20to%20use%20Azure%20Boards%20from%20other%20organisations%2C%20and%20if%20so%2C%20even%26nbsp%3Bwith%20different%20credentials%3F%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EBest%2C%20Daniel%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-324508%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-324508%22%20slang%3D%22en-US%22%3E%3CP%3EThanks%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F68%22%20target%3D%22_blank%22%3E%40Brian%20Smith%3C%2FA%3E.%20I%20suspect%20that%20the%20tech%20will%20be%20walking%20me%20through%20those%20steps%20%3A)%3C%2Fimg%3E%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-324474%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-324474%22%20slang%3D%22en-US%22%3E%3CP%3EThanks%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F242800%22%20target%3D%22_blank%22%3E%40Sean%20Decker%3C%2FA%3E%20and%20sorry%20for%20the%20run-around.%26nbsp%3B%20I%20have%20some%20internal%20threads%20going%20-%20and%20it%20seems%20the%20upgrade%20documentation%20isn't%20written%20for%20customers%20in%20this%20kind%20of%20scenario%20(which%20is%20probably%20many%20of%20our%20Project%20Online%20customers)%20-%20we%20will%20get%20this%20sorted.%3C%2FP%3E%0A%3CP%3EBest%20regards%2C%3C%2FP%3E%0A%3CP%3EBrian.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-324465%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-324465%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3E%26nbsp%3BI've%20tried%20going%20through%20the%20CDS%20steps%20but%20we%20have%20no%20existing%20environments%20in%20the%20link.%20The%20support%20case%20has%20been%20reassigned%20for%20the%203rd%20time%20to%20another%20team.%20We'll%20see%20if%20they%20can%20clarify%20what%20on%20earth%20needs%20to%20be%20configured%20with%20CDS.%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-324388%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-324388%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F4878%22%20target%3D%22_blank%22%3E%40Roy%20Gilboa%3C%2FA%3E%26nbsp%3Bthat%20is%20correct%20-%20we%20pushed%20the%20fix%20out%20yesterday%20afternoon%20to%20clarify%20the%20message.%26nbsp%3B%20Keep%20us%20up%20to%20date%20on%20how%20it%20goes!%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-324341%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-324341%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3E%26nbsp%3Band%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F68%22%20target%3D%22_blank%22%3E%40Brian%20Smith%3C%2FA%3E%2C%3C%2FP%3E%3CP%3EAs%20of%20today%20I'm%20seeing%20a%20different%20message%20which%20I%20assume%20is%20related%20to%20this%20thread%20(see%20below).%3C%2FP%3E%3CP%3EI'm%20going%20to%20review%20the%20recommended%20steps%20regarding%20CDS%20and%20update%20here.%3C%2FP%3E%3CP%3EThank%20you%20both%20for%20your%20time%20and%20efforts.%3C%2FP%3E%3CP%3ERoy%3C%2FP%3E%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-inline%22%20style%3D%22width%3A%20842px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F70726i36BF4A646B863D67%2Fimage-size%2Flarge%3Fv%3D1.0%26amp%3Bpx%3D999%22%20alt%3D%22CDS.PNG%22%20title%3D%22CDS.PNG%22%20%2F%3E%3C%2FSPAN%3E%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-324094%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-324094%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F200561%22%20target%3D%22_blank%22%3E%40SEAN%20K%3C%2FA%3E%26nbsp%3Bhave%20you%20gone%20through%20the%20CDS%20deployment%20steps%3F%20we%20have%20a%20bug%20we%20are%20fixing%20where%20we%20give%20the%20wrong%20status%20message%20here.%20we%20will%20get%20this%20worked%20out.%20Feel%20free%20to%20PM%20your%20tenant%20URL%20and%20we%20can%20take%20a%20look.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-324020%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-324020%22%20slang%3D%22en-US%22%3E%3CP%3EI've%20been%20through%20that%20page.%20My%20screen%20is%20exactly%20like%26nbsp%3B%3C%2FP%3E%3CP%3E%2B%2B%2B%2B%2B%2B%2B%2B%2B%2B%2B%2B%3CBR%20%2F%3ERoadmap%20is%20not%20yet%20available%20to%20your%20organization%3C%2FP%3E%3CP%20class%3D%22%22%3EThe%20Roadmap%20feature%20is%20being%20gradually%20rolled%20out%20to%20organizations%20over%20a%20period%20of%20time%2C%20similar%20to%20how%20other%3CSPAN%3E%26nbsp%3B%3C%2FSPAN%3E%3CA%20href%3D%22https%3A%2F%2Fsupport.office.com%2Farticle%2Fwhen-do-i-get-the-newest-features-in-for-office-365-da36192c-58b9-4bc9-8d51-bb6eed468516%22%20target%3D%22_blank%22%20rel%3D%22noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%22%3EOffice%20365%20features%20are%20made%20available%3C%2FA%3E.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3E%3CIMG%20src%3D%22https%3A%2F%2Fdocs.microsoft.com%2Fen-us%2Fprojectonline%2Fmedia%2Froadmapna.png%22%20border%3D%220%22%20alt%3D%22Roadmap%20not%20available%22%20%2F%3E%3C%2FP%3E%3CP%3E%2B%2B%2B%2B%2B%2B%2B%2B%2B%2B%2B%2B%2B%3C%2FP%3E%3CP%3Eand%20the%20tech%20tried%20to%20tell%20me%20it's%20still%20being%20rolled%20out%20but%20I%20pointed%20him%20to%20this%20thread.%20Our%20tenant%20is%20based%20in%20North%20America.%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-324000%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-324000%22%20slang%3D%22en-US%22%3E%3CP%3EI've%20reached%20out%20to%20Sean%20via%20Direct%20Message%20to%20get%20details%20of%20the%20support%20case%20so%20we%20can%20identify%20why%20this%20incorrect%20information%20was%20given%20out.%3C%2FP%3E%0A%3CP%3EThanks%2C%3C%2FP%3E%0A%3CP%3EBrian%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-323982%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-323982%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F29345%22%20target%3D%22_blank%22%3E%40Sean%20Decker%3C%2FA%3E%26nbsp%3Bmmm.%20well%20Roadmap%20itself%20is%20rolled%20out%20to%20100%25%20of%20commercial%20tenants%20(with%20the%20exception%20of%20France%20and%20Korea%20where%20CDS%20is%20not%20available).%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EHave%20you%20guys%20gone%20through%20this%3A%20%3CA%20href%3D%22https%3A%2F%2Fdocs.microsoft.com%2Fen-us%2Fprojectonline%2Fturn-roadmap-on-or-off%23roadmap-is-not-yet-available-in-your-region%22%20target%3D%22_self%22%20rel%3D%22noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%22%3Ehttps%3A%2F%2Fdocs.microsoft.com%2Fen-us%2Fprojectonline%2Fturn-roadmap-on-or-off%23roadmap-is-not-yet-available-in-your-region%3C%2FA%3E%3F%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3Edo%20you%20have%20a%20screenshot%20of%20your%20365%20admin%20console%20you%20could%20share%3F%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F68%22%20target%3D%22_blank%22%3E%40Brian%20Smith%3C%2FA%3E%26nbsp%3Bdo%20we%20have%20the%20right%20support%20scripts%20out%20to%20the%20team%3F%26nbsp%3B%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-323896%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-323896%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3E%26nbsp%3BThis%20is%20such%20a%20frustrating%20experience.%20I%20am%20on%20the%20phone%20w%2F%20support%20and%20they%20are%20telling%20me%20it%20is%20still%20be%20rolled%20out%20to%20tenants.%20This%20is%20the%20same%20answer%20I%20was%20given%20in%20November%20when%20I%20received%20an%20email%20telling%20me%20it%20was%20available.%20So%20which%20is%20correct%3F%201)%20The%20statement%20on%20Jan%2016th%20saying%20%22%3CSPAN%3Ewe%20have%20enabled%20100%25%20of%20commercial%20tenants%3C%2FSPAN%3E%22%202)%20the%20support%20rep%20saying%20it's%20still%20being%20rolled%20out%20and%20there%20is%20not%20date%20when%20we'll%20see%20it%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-323675%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-323675%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F4878%22%20target%3D%22_blank%22%3E%40Roy%20Gilboa%3C%2FA%3E%20-%20see%20%3CA%20href%3D%22https%3A%2F%2Fdocs.microsoft.com%2Fen-us%2Fprojectonline%2Fturn-roadmap-on-or-off%23roadmap-is-not-yet-available-in-your-region%22%20target%3D%22_self%22%20rel%3D%22noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%22%3Ehttps%3A%2F%2Fdocs.microsoft.com%2Fen-us%2Fprojectonline%2Fturn-roadmap-on-or-off%23roadmap-is-not-yet-available-in-your-region%3C%2FA%3E%20but%20unless%20the%20error%20message%20specifically%20says%20Region%20it%20may%20be%20more%20likely%20that%20CDS%20has%20not%20been%20upgeaded%20-%20which%20is%20covered%20in%20the%20same%20document.%3C%2FP%3E%0A%3CP%3EBest%20regards%2C%3C%2FP%3E%0A%3CP%3EBrian.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-323642%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-323642%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3E%2C%20thanks%20for%20answering.%3C%2FP%3E%3CP%3EWe%20still%20can't%20enable%20that%20feature%20much%20like%20others%20here.%20Where%20can%20we%20review%20the%20region%20availability%3F%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3ERegards%2C%3C%2FP%3E%3CP%3ERoy%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-323636%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-323636%22%20slang%3D%22en-US%22%3E%3CP%3EHi%20%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F2087%22%20target%3D%22_blank%22%3E%40Trutz%20Stephani%3C%2FA%3E%2C%20please%20check%20%3CA%20href%3D%22https%3A%2F%2Faka.ms%2Fenableroadmap%22%20target%3D%22_blank%22%20rel%3D%22noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%22%3Ehttps%3A%2F%2Faka.ms%2Fenableroadmap%3C%2FA%3E%20for%20an%20valid%20reasons%20that%20it%20wouldn't%20be%20showing%20up.%26nbsp%3B%20Generally%20it%20comes%20down%20to%20upgrading%20CDS%20(especially%20the%20default%20environment)%2C%20have%20Project%20Online%20Premium%20or%20Professional%20licenses%20(not%20Project%20Online%20through%20Dynamics)%20and%20also%20being%20in%20a%20region%20that%20has%20CDS%20support%20(France%20and%20South%20Korea%20are%20examples%20of%20regions%20that%20do%20not%20have%20this%20yet).%26nbsp%3B%20If%20you%20and%20the%20customer%20have%20checked%20all%20this%20then%20of%20course%20open%20a%20support%20ticket.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EHi%20%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F242800%22%20target%3D%22_blank%22%3E%40Sean%20Decker%3C%2FA%3E%20-%20if%20you%20saw%20an%20error%20then%20please%20open%20a%20support%20case%20and%20we%20can%20check%20what%20the%20error%20means.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EBest%20regards%2C%3C%2FP%3E%0A%3CP%3EBrian.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-323518%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-323518%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3Esame%20here%2C%20we%20still%20have%20a%20commercial%20tenant%20in%20first%20release%20mode%20that%20hasn't%20received%20the%20feature.%20Should%20we%20raise%20a%20support%20ticket%20or%20just%20keep%20our%20fingers%20crossed%20that%20it%20will%20arrive%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-320922%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-320922%22%20slang%3D%22en-US%22%3E%3CP%3ESame%20here!%20We%20are%20desperately%20waiting%20for%20this%20functionality%20and%20could%20even%20use%20it%20at%20customer%20sites.%20%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-320889%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-320889%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3E%26nbsp%3BAs%20of%20today%20we%20are%20still%20getting%3CBR%20%2F%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-inline%22%20style%3D%22width%3A%20408px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F69027i1BD641FA9469F54C%2Fimage-size%2Flarge%3Fv%3D1.0%26amp%3Bpx%3D999%22%20alt%3D%22image.png%22%20title%3D%22image.png%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%3CP%3EWe%20are%20a%20commercial%20tenant.%20In%20December%20we%20had%20the%20slider%20box%20to%20enable%20but%20it%20errored.%20Our%20project%20management%20team%20asks%20me%20every%20week%20about%20this%20functionality.%26nbsp%3B%3C%2FP%3E%3CBLOCKQUOTE%3E%3CHR%20%2F%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3C%2FBLOCKQUOTE%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-319561%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-319561%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F4878%22%20target%3D%22_blank%22%3E%40Roy%20Gilboa%3C%2FA%3E%26nbsp%3Bplease%20check%20now%20-%20we%20have%20enabled%20100%25%20of%20commercial%20tenants%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-319557%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-319557%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F264163%22%20target%3D%22_blank%22%3E%40Jack_Huang%3C%2FA%3E%26nbsp%3Btry%20this%20%3CA%20href%3D%22https%3A%2F%2Fwww.youtube.com%2Fwatch%3Fv%3DUIKfbENHcH8%26amp%3Bindex%3D10%26amp%3Blist%3DPLeEN8pD32G72UcDbwUzMMmc-VtcQ1T9wr%26amp%3Bt%3D0s%22%20target%3D%22_self%22%20rel%3D%22nofollow%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%22%3Econfiguring%20Azure%20Boards%20for%20Roadmap%20connections%3C%2FA%3E%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-313876%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-313876%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3E%26nbsp%3Band%20others%2C%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EJust%20turned%20on%20the%20Roadmap%2C%20and%20tried%20a%20bit%2C%20really%20like%20the%20idea%2C%20and%20just%20have%20a%20quick%20question%3A%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EWhen%20I%20connect%20to%20the%20Azure%20DevOps%2C%20if%20I%20add%20a%20%22Feature%22%2C%20it%20will%20pull%20the%20Start%20and%20End%20date%20from%20the%20%22Feature%22.%20If%20I%20add%20a%20User%20Story%2C%20then%20it%20doesn't%20have%20them%20-%20is%20there%20any%20way%20to%20fix%20it%20or%20can%20I%20add%20these%20dates%20manually%3F%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EThanks%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-307499%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-307499%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3E%26nbsp%3B%2F%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F68%22%20target%3D%22_blank%22%3E%40Brian%20Smith%3C%2FA%3E%2C%3C%2FP%3E%3CP%3EOn%20our%20tenant%20I%20still%20see%20the%20%22%3CSPAN%3E%3CFONT%20color%3D%22%23FF0000%22%3ERoadmap%20is%20not%20yet%20available%20for%20your%20organization%3C%2FFONT%3E%22%20message.%20Is%20there%20anywhere%20a%20service%20that%20we%20can%20query%20to%20verify%20when%20our%20organization%20is%20finally%20entitled%20to%20enable%20this%20feature%3F%3C%2FSPAN%3E%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3E%3CSPAN%3EThanks%2C%3C%2FSPAN%3E%3C%2FP%3E%3CP%3E%3CSPAN%3ERoy%3C%2FSPAN%3E%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-297629%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-297629%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F226183%22%20target%3D%22_blank%22%3E%40Matt%20Burback%3C%2FA%3E%26nbsp%3BMatt%2C%20you%20are%20correct.%20CDS%20is%20being%20upgraded%20across%20all%20of%20our%20customers%20as%20we%20speak.%20When%20Roadmap%20is%20ready%2C%20and%20you%20turn%20it%20on%2C%20we%20will%20trigger%20the%20CDS%202.0%20upgrade%20if%20it%20has%20not%20already%20happened.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EHope%20that%20helps%2C%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EH%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-297521%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-297521%22%20slang%3D%22en-US%22%3E%3CP%3EHi%20Matt%2C%20you%20are%20correct%20that%20you%20will%20need%20CDS%202.0%20for%20Roadmap%20and%20there%20will%20shortly%20be%20some%20documentation%20to%20address%20this.%26nbsp%3B%20My%20understanding%20is%20that%20in%20some%20cases%20this%20change%20from%20CDS%201.0%20to%202.0%20will%20be%20automatic%20and%20in%20other%20cases%20there%20may%20be%20manual%20steps%20required%20-%20the%20documentation%20will%20cover%20this.%3C%2FP%3E%0A%3CP%3EBest%20regards%2C%3C%2FP%3E%0A%3CP%3EBrian%20Smith%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-295586%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-295586%22%20slang%3D%22en-US%22%3E%3CP%3EHello%20Microsoft%20Team%2C%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EI%20have%20a%20new%20set%20of%20questions%20regarding%20Project%20Roadmap%20in%20my%20Office%20365%20tenant.%26nbsp%3B%20As%20of%20today%20I%20can%20see%20in%20the%20Office%20365%20Admin%20Center%20%2F%20Settings%20%2F%20Services%20%26amp%3B%20Add-ins%20there%20is%20now%20a%20choice%20for%20%22Project%20Online%22%20with%20a%20slider%20to%20turn%20on%2Foff%20Project%20Roadmap.%26nbsp%3B%20But%20it%20states%20it%20is%20not%20yet%20available%20for%20my%20organization.%26nbsp%3B%20However%2C%20I%20click%20on%20the%20link%20for%20the%20support%20article%20and%20found%20this%20page%3A%3C%2FP%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Fdocs.Microsoft.com%2Fen-us%2FProjectOnline%2Fremove-roadmap-from-office-365%26nbsp%3B%22%20target%3D%22_blank%22%20rel%3D%22noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%22%3Ehttps%3A%2F%2Fdocs.Microsoft.com%2Fen-us%2FProjectOnline%2Fremove-roadmap-from-office-365%26nbsp%3B%3C%2FA%3E%3C%2FP%3E%3CP%3EMy%20concern%20is%20that%20when%20I%20look%20at%20my%20D365%20%22default%20instance%22%20it%20appears%20to%20be%20for%20the%20D365%20Talent%20which%20I%20think%20is%20the%20CDS%201.0%20version.%26nbsp%3B%20As%20I%20know%20that%20CDS%202.0%20is%20based%20on%20D365CE%20and%20within%20this%20article%20it%20speaks%20to%20a%20solution%20file%20-%20does%20this%20mean%20my%20O365%20instance%20will%20not%20get%20Project%20Roadmap%20because%20my%20default%20instance%20of%20D365%20is%20at%20a%20CDS%201.0%20level%3F%3C%2FP%3E%3CP%3Ethanks!%3C%2FP%3E%3CP%3EMatt%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-294757%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-294757%22%20slang%3D%22en-US%22%3E%3CP%3EThank%20you%20for%20clarifying%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3E%20I%20think%20I%20got%20the%20premium%20from%20a%20diagram%20that%20showed%20Roadmap%20at%20the%20apex%20of%20a%26nbsp%3Becosystem%20pyramid%20alongside%20Premium%20for%20portfolio%20management.%20Thanks%20for%20correcting%20me.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-294727%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-294727%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F82%22%20target%3D%22_blank%22%3E%40Simon%20Denton%3C%2FA%3E%26nbsp%3BPro%20to%20create%2C%20not%20premium.%20And%20you%20are%20correct%20-%20licensing%20and%20security%2Faccess%20are%20'additive'.%20you%20need%20the%20appropriate%20license%20and%20permissions.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-294635%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-294635%22%20slang%3D%22en-US%22%3E%3CP%3EThanks%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3E%20.%20So%20Premium%20license%20to%20create%2C%20Essential%20to%20consume.%20I%20guess%20the%20thinking%20is%20that%20most%20users%20will%20have%20an%20existing%20Office%20365%20E3%20%2F%20E5%20license%20and%20so%20they%20will%20be%20able%20to%20work%20with%20the%20associated%20Planner%20but%20I'm%20guessing%20that%20they%20might%20need%20to%20be%20given%20Member%20status%20in%20the%20Office%20365%20Group%20to%20do%20that.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-294367%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-294367%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F163372%22%20target%3D%22_blank%22%3E%40Petr%20Kren%C5%BEelok%3C%2FA%3E%26nbsp%3BI%20really%20mean%20it.%20Your%20feedback%20is%20noted.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-294364%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-294364%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F2087%22%20target%3D%22_blank%22%3E%40Trutz%20Stephani%3C%2FA%3E%26nbsp%3BWe%20will%20publish%20this%20soon.%20There%20will%20be%20an%26nbsp%3Badmin%20toggle%20to%20turn%20on%20Roadmap%20until%20all%20our%20compliance%20Audits%20are%20done%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-294362%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-294362%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F82%22%20target%3D%22_blank%22%3E%40Simon%20Denton%3C%2FA%3E%26nbsp%3BYes.%20Project%20Essentials%20users%20will%20have%20read%20access%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-294310%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-294310%22%20slang%3D%22en-US%22%3E%3CP%3E%22viewing%20is%20gated%20by%20the%20Project%20Essentials%20license%22%20-%20do%20you%20really%20mean%20it%3F%20Aren't%20Roadmaps%20supposed%20to%20support%20also%20a%20Planner%3F%20If%20so%2C%20then%20the%20licensing%20requiring%20a%20Project%20Essentials%20license%20is%20kind%20of%20strange%20imo.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-294305%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-294305%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3E%26nbsp%3Bis%20there%20already%20(or%20when%20will%20there%20be)%20a%20service%20description%20that%20details%20all%20these%20licensing%20requirements%20and%20also%20highlights%20the%20Power%20platform%20licensing%3F%20Any%20steps%20to%20activate%20Roadmaps%20necessary%20or%20will%20it%20just%20appear%20in%20Project%20Home%3F%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-294296%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-294296%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F82%22%20target%3D%22_blank%22%3E%40Simon%20Denton%3C%2FA%3E%26nbsp%3Bviewing%20is%20gated%20by%20the%20Project%20Essentials%20license.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-294287%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-294287%22%20slang%3D%22en-US%22%3E%3CP%3ESorry%20to%20nag%20%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3E%26nbsp%3Bbut%20will%20the%20licencing%20separate%20consumers%20from%20roadmap%20creators%3F%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-294284%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-294284%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F248992%22%20target%3D%22_blank%22%3E%40dlendry%3C%2FA%3E%26nbsp%3BWe%20are%20going%20as%20fast%20as%20we%20can%20%3A)%3C%2Fimg%3E%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-294281%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-294281%22%20slang%3D%22en-US%22%3E%3CP%3EThank%20you%2C%20We%20are%20going%20live%20with%20Project%20Online%20in%202%20weeks.%20Roadmaps%20are%20requirement%20that%20I%20was%20going%20to%20satisfy%20with%20OnePage%20Pro.%20As%20Roadmap%20meets%20the%20requirement%2C%20what%20can%20I%20do%20to%20get%20it%20added%20sooner%3F%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EThank%20you%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-294277%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-294277%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F248992%22%20target%3D%22_blank%22%3E%40dlendry%3C%2FA%3E%26nbsp%3BIt%20is%20beginning%20to%20roll%20out%20to%20production%20tenants.%20Over%20the%20next%20month%20it%20will%20begin%20to%20appear%20in%20customer's%20Project%20Online%20deployments.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EH%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-294258%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-294258%22%20slang%3D%22en-US%22%3E%3CP%3EHas%20Roadmap%20been%20released%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-290019%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-290019%22%20slang%3D%22en-US%22%3E%3CP%3ECan%20we%20participate%20in%20the%20early%20adopters%20program%20for%20the%20new%20roadmapping%20features%3F%26nbsp%3B%20Does%20this%20new%20capability%20integrate%20with%20Jira-based%20project%20data%3F%26nbsp%3B%20None%20of%20the%20figures%20seem%20to%20demonstrate%20much%20interdependency%20between%20roadmap%20tasks.%26nbsp%3B%20For%20technology%20roadmapping%2C%20I'd%20like%20to%20be%20able%20to%20show%20a%20linkage%20and%20flowdown%20from%20program%20milestones%20to%20technology%20gaps%20to%20specific%20technology%20needs%20to%20technology%20solutions%2Fsources.%26nbsp%3B%20Is%20that%20doable%20within%20the%20new%20roadmapping%20features%20within%20MS%20Project%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-288858%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-288858%22%20slang%3D%22en-US%22%3E%3CP%3E%2B1%20on%20licensing%20-%20it%20needs%20to%20be%20company%20wide%2C%20or%20the%20tool%20will%20find%20very%20limited%20use%20....%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-288855%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-288855%22%20slang%3D%22en-US%22%3E%3CP%3EWhilst%20excited%20for%20the%20product%20I'm%20still%20unclear%20about%20its%20licensing.%20Roadmaps%20are%20typically%20%3CU%3Ecreated%20by%20a%20limited%20set%20of%20users%3C%2FU%3E.%20From%20my%20understanding%20of%20its%20capabilities%20I%20foresee%20that%20creators%20will%20need%20some%20from%20of%20premium%20license.%20On%20the%20flip%20side%2C%20Roadmaps%20are%20%3CU%3Econsumed%20by%20many%20users%3C%2FU%3E.%20I%20cannot%20see%20the%20viability%20of%20assigning%20premium%20licenses%20to%20users%20who%20just%20need%20to%20consume%20(read%20%2F%20view)%20the%20content%20of%20the%20roadmap.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EWhat%20will%20the%20licensing%20model%20be%20for%20consumers%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-288846%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-288846%22%20slang%3D%22en-US%22%3E%3CP%3EThe%20Office%20365%20Message%20Center%20post%20was%20updated%20to%20say%20the%20feature%20will%20be%20available%20starting%20'mid-December%2C%202018'.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-288623%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-288623%22%20slang%3D%22en-US%22%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F163372%22%20target%3D%22_blank%22%3E%40Petr%20Kren%C5%BEelok%3C%2FA%3E%20I%20don't%20know%2C%20I'm%20sure%20the%20MS%20team%20will%20let%20us%20know.%20It'll%20make%20Planner%20a%20lot%20more%20attractive%20for%20sure.%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-288620%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-288620%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F242860%22%20target%3D%22_blank%22%3E%40Gary%20Revell%3C%2FA%3EI%20am%20not%20sure%20Planner%20is%20going%20to%20be%20supported%20from%20the%20beginning%2C%20or%20is%20it%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-288617%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-288617%22%20slang%3D%22en-US%22%3EGood%20to%20see%20the%20Roadmap%20feature%20becoming%20available%20on%20MS%20Project%2C%20and%20not%20before%20time%20TBH.%20Creating%20plans%20in%20Project%20and%20then%20having%20to%20update%20Excel%20roadmaps%20is%20not%20always%20easy%20and%20requires%20effort.%20It%20will%20also%20make%20O365%20Planner%20more%20attractive%20as%20I%20tend%20to%20use%20Asana%20or%20Trello%20which%20have%20much%20more%20functionality.%20We%20look%20forward%20to%20using%20this%20new%20feature.%20Gary%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-287948%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-287948%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F47172%22%20target%3D%22_blank%22%3E%40Greg%20Fisher%3C%2FA%3E%26nbsp%3Byes%20Greg%2C%20there%20will%20be%20a%20new%20toggle%20under%20Project%20Online.%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EI%20will%20send%20out%20an%20update%20when%20its%20starts%20rolling%20out%20-%20but%20it%20won't%20happen%20everywhere%20simultaneously%20as%20our%20cloud%20is%20pretty%20big%20%3A)%3C%2Fimg%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EWe%20are%20rolling%20out%20and%20testing%20against%20the%20Microsoft%20tenant%20first%20(this%20weekend).%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3Eh%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-287944%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-287944%22%20slang%3D%22en-US%22%3EWill%20you%20announce%20here%20on%20the%20blog%20when%20it's%20available%3F%20I%20had%20in%20my%20calendar%20a%20%22General%20availability%22%20announcement%20for%20yesterday%20to%20check%20for.%20A%20couple%20of%20my%20teammates%20are%20excited%20to%20try%20this.%20Will%20the%20instructions%20to%20turn%20on%20still%20be%20this%3A%20If%20you%20would%20like%20to%20enable%20Project%20Roadmap%20for%20your%20users%2C%20you%20can%20verify%20the%20setting%20is%20available%20after%20November%2014%20by%20navigating%20to%20your%20Office%20365%20admin%20center%2C%20click%20on%20Settings%20%2F%20Services%20%26amp%3B%20add-ins%20%2F%20Project%20Online.%20Then%20enable%20the%20option%20to%20%E2%80%9CTurn%20Roadmap%20on%20or%20off%20for%20your%20entire%20organization.%E2%80%9D%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-287235%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-287235%22%20slang%3D%22en-US%22%3E%3CP%3EFolks%2C%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3ERoadmap%20will%20begin%20rolling%20out%20shortly%20and%20there%20are%20a%20variety%20of%20factors%20that%20will%20determine%20when%20your%20tenant%20will%20receive%20the%20feature.%20Be%20a%20bit%20patient%2C%20it%20is%20coming%20%3A)%3C%2Fimg%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EH%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-287169%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-287169%22%20slang%3D%22en-US%22%3E%3CP%3EDoes%20anyone%20know%20how%20to%20turn%20this%20on%3F%20I%20have%20a%20couple%20of%20team%20members%20waiting%20to%20try%20this%20out.%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-286872%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-286872%22%20slang%3D%22en-US%22%3E%3CP%3ENot%20yet%20here%20Matt%2C%20but%20may%20depend%20on%20our%20timezone%20-1%20and%20server.%20We%20are%20on%20first%20release%20chanel.%20Hopefully%20tomorrow.%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-286865%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-286865%22%20slang%3D%22en-US%22%3E%3CP%3EHello%20-%20as%20it%20is%20November%2014%202018%20-%20has%20anyone%20seen%20the%20Settings%20%2F%20Service%20%26amp%3B%20add-ins%20%2F%20Project%20Online%20appear%20in%20their%20O365%20Admin%20Portal%3F%26nbsp%3B%20My%20hope%20is%20to%20try%20out%20the%20new%20Roadmap%20and%20Flow%20capabilities.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-278472%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-278472%22%20slang%3D%22en-US%22%3E%3CP%3EWhich%20type%20of%20license%20will%20viewers%20of%20a%20roadmap%20need%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-277270%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-277270%22%20slang%3D%22en-US%22%3E%3CP%3EAs%20Brian%20wrote%20a%20bit%20higher%20up%3A%26nbsp%3B%3CSPAN%3E%20%22The%20Roadmap%20product%20would%20be%20available%20to%20anyone%20with%20a%20Project%20Online%20Premium%20or%20Professional%20license%3C%2FSPAN%3E%22%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-277250%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-277250%22%20slang%3D%22en-US%22%3E%3CP%3EWhich%20licenses%20will%20be%20needed%20to%20use%20this%3F%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-277109%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-277109%22%20slang%3D%22en-US%22%3E%3CP%3EYes%2C%20good%20to%20highlight%20that.%20I%20wrote%20%22start%22%2C%20but%20it%20is%20good%20to%20remind%20that%20the%20rollout%20doesn't%20take%20place%20in%20a%20single%20day%20on%20all%20tenants%2C%20it%20is%20more%20something%20of%20days.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-277105%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-277105%22%20slang%3D%22en-US%22%3E%3CP%3ETo%20set%20expectations%20Trutz%20-%20rollout%20will%20not%20start%20before%20November%2014th%20-%20I%20wouldn't%20necessarily%20book%20your%20diary%20for%20that%20exact%20day.%3C%2FP%3E%0A%3CP%3EBest%20regards%2C%3C%2FP%3E%0A%3CP%3EBrian%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-277043%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-277043%22%20slang%3D%22en-US%22%3E%3CP%3EAccording%20to%20the%20O365%20Admin%20Center%20rollout%20starts%20November%2014th.%20Looking%20forward%20to%20it.%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-277035%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-277035%22%20slang%3D%22en-US%22%3E%3CP%3EHi%20Larissa%2C%20I'm%20not%20sure%20what%20you%20mean%20by%20support%20for%20Project%20Standard.%26nbsp%3B%20The%20Roadmap%20product%20would%20be%20available%20to%20anyone%20with%20a%20Project%20Online%20Premium%20or%20Professional%20license%20-%20and%20these%20licenses%20also%20include%20the%20Project%20Online%20Desktop%20Client%20(more%20or%20less%20equivalent%20to%20Project%20Professional)%20-%20and%20the%20plans%20that%20are%20pulled%20into%20the%20Roadmap%20are%20those%20stored%20in%20Project%20Online.%26nbsp%3B%20Are%20you%20just%20meaning%20you'd%20want%20to%20pull%20in%20from%20mpp%20files%3F%26nbsp%3B%20That%20isn't%20something%20that%20is%20being%20planned%20-%20and%20hopefully%20understanding%20how%20this%20fits%20with%20Project%20Online%20you%20will%20understand%20why%20that%20is%20the%20case.%26nbsp%3B%20If%20I'm%20missing%20something%20with%20your%20scenario%20then%20please%20let%20me%20know.%3C%2FP%3E%0A%3CP%3EBest%20regards%2C%3C%2FP%3E%0A%3CP%3EBrian%20Smith%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-276679%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-276679%22%20slang%3D%22en-US%22%3E%3CP%3EIs%20there%20an%20ETA%20for%20when%20MS%20Project%20Standard%20will%20be%20supported%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-275790%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-275790%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F163372%22%20target%3D%22_blank%22%3E%40Petr%20Kren%C5%BEelok%3C%2FA%3E%26nbsp%3BPlanner%20currently%20inherits%20ownership%20from%20the%20Modern%20group.%20I%20understand%20that%20this%20might%20not%20solve%20all%20scenarios%20as%20you%20point%20out%20-%20we%20are%20always%20looking%20at%20better%20notifications.%20There%20was%20a%20session%20at%20ignite%20I%20would%20refer%20you%20to%20with%20some%20of%20the%20work%20we%20are%20doing%20and%20%3CA%20href%3D%22http%3A%2F%2Fplanner.uservoice.com%22%20target%3D%22_blank%22%20rel%3D%22noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%22%3Ehttp%3A%2F%2Fplanner.uservoice.com%3C%2FA%3E%20is%20a%20great%20resource%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-275781%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-275781%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3EThat's%20great%2C%20thank%20you.%20Having%20a%20%22flying%22%20projects%20in%20Roadmap%20will%20help%20us%20to%20wait%20for%20the%20Planner%20being%20connected%20to%20Roadmap%20later.%20You%20have%20mentioned%20an%20owner.%20I%20just%20recently%20found%20out%2C%20that%20owner%20capability%20is%20missing%20from%20Planner%20and%20kind%20of%20can't%20believe%20it%20%3A(%3C%2Fimg%3E%20We%20are%20setting%20up%20an%20environment%20for%20management%20tasks%20and%20CEO's%20assistant%20is%20putting%20tasks%20there.%20But%20we%20want%20CEO%20being%20an%20owner%20and%20being%20notified%2C%20not%20the%20assistant%20as%20an%20author%20of%20the%20task.%20Don't%20know%20how%20to%20aproach%20this.%20Looking%20into%20a%20Roadmap%20for%20O365%2C%20there%20don't%20seem%20to%20be%20any%20additional%20features%20planned%20for%20it%2C%20at%20least%20not%20publicly.%20Also%20permission%20system%20is%20missing.%20Well%2C%20I%20like%20Planner%20a%20lot%20-%20it%20is%20almost%20there%20...%20but%20not%20actually%20there%20...%20yet%20....%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-275778%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-275778%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F163372%22%20target%3D%22_blank%22%3E%40Petr%20Kren%C5%BEelok%3C%2FA%3E%26nbsp%3BYou%20can%20add%20a%20row%20and%20an%20owner%20without%20connecting%20it.%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EIf%20you%20wanted%20to%20'get%20extreme'%20you%20could%20probably%20even%20write%20a%20Flow%20to%20create%20a%20Project%20behind%20the%20row%20automatically.%20I%20haven't%20tried%20it.%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-275776%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-275776%22%20slang%3D%22en-US%22%3E%3CP%3EIs%20there%20a%20possibility%20to%20add%20a%20project%20row%20to%20the%20Roadmap%2C%20without%20actually%20linking%20it%20to%20the%20Project%20or%20Azure%20items%3F%20Simply%20put%20the%20ability%20to%20add%20an%20ad-hoc%20project%20there%2C%20just%20for%20the%20means%20of%20the%20presentation%20itself%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-275771%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-275771%22%20slang%3D%22en-US%22%3E%3CP%3EHi%20Taj%2C%20can%20you%20give%20more%20detail%20of%20what%20you%20mean%20by%20priority%3F%26nbsp%3B%20The%20Roadmap%20has%20different%20rows%20that%20show%20deliverables%20towards%20the%20common%20Roadmap%20goal%20-%20and%20they%20can%20be%20ordered%20vertically%20-%20but%20where%20would%20you%20see%20priority%20coming%20in%20to%20play%20at%20this%20level%3F%3C%2FP%3E%0A%3CP%3EThanks%2C%3C%2FP%3E%0A%3CP%3EBrian.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-275768%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-275768%22%20slang%3D%22en-US%22%3E%3CP%3EHi%20Peter%2C%20currently%20Project%20Online%20supports%20Safari%20-%20so%20MAC%20users%20are%20able%20to%20engage%2C%20and%20this%20does%20give%20schedule%20editing%20capabilities.%26nbsp%3B%20There%20is%20not%20yet%20full%20parity%20with%20the%20scheduling%20capability%20of%20Project%20Professional%20-%20which%20I%20sense%20is%20what%20your%20question%20is%20really%20asking.%26nbsp%3B%20But%20Project%20has%20been%20in%20the%20cloud%20for%20some%20time.%26nbsp%3B%20The%20announcement%20that%20this%20thread%20pertains%20to%20-%20Roadmap%20-%26nbsp%3B%20is%20purely%20web%20based.%3C%2FP%3E%0A%3CP%3EBest%20regards%2C%3C%2FP%3E%0A%3CP%3EBrian%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-275754%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-275754%22%20slang%3D%22en-US%22%3E%3CP%3EIn%20the%20demos%20that%20I%20have%20seen%20so%20far%20for%20Roadmap%2C%20I%20haven't%20noted%20any%20capability%20for%20prioritization%3F%26nbsp%3B%20Does%20the%20capability%20exist%20currently%20in%20the%20initial%20rollout%2C%20or%20are%20there%20plans%20to%20add%20such%20features%3F%20Thanks!%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-275199%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-275199%22%20slang%3D%22en-US%22%3E%3CP%3EPlease%20confirm%20if%20there%20has%20been%20any%20improvement%20on%20truly%20taking%20Project%20to%20the%20cloud%20-%20by%20this%20I%20mean%20me%20being%20able%20to%20access%20Project%20from%20a%20MAC%20running%20OS%20X%20El%20Capitan%20and%20NOT%20windows%20or%20dual%20OS%20options.%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-274541%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-274541%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F229106%22%20target%3D%22_blank%22%3E%40Matthew%20Cooper%3C%2FA%3E%26nbsp%3BThere%20are%20a%20number%20of%20things%20here%3A%3C%2FP%3E%0A%3CP%3E-%20Project%20home%20currently%20saves%20new%20projects%20to%20the%20default%20instance.%20we%20are%20working%20on%20the%20ability%20for%20a%20user%20to%20set%20a%20different%20instance%20to%20save%20to.%3C%2FP%3E%0A%3CP%3E-%20The%20MRU%20on%20home%20shows%20you%20projects%20you%20have%20worked%20on%20from%20all%2Fany%20instance%20-%20so%20this%20should%20work%20just%20fine%20in%20larger%20multi-instance%20orgs%3C%2FP%3E%0A%3CP%3E-%20Roadmaps%20are%20secured%20using%20AD%20modern%20groups.%20there%20is%20no%20notion%20of%20instance%20currently.%20they%20can%20connect%20to%20any%20instance%20that%20the%20author%20of%20the%20roadmap%20has%20access%20to.%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3Ehope%20that%20helps%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-274402%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-274402%22%20slang%3D%22en-US%22%3E%3CP%3EHi%20Guys%2C%20can%20you%20give%20us%20some%20more%20information%20on%20how%20the%20Project%20Home%20and%20Roadmap%20works%20with%20security.%20Currently%20the%20homepage%20feature%20only%20points%20to%20the%20default%20PWA%20instance%20which%20in%20larger%20multi%20Instance%20set%20up%20doesn't%20work%20is%20it%20is%20being%20used%20as%20a%20generic%20landing%20page%20to%20sign%20post%20to%20the%20various%20Business%20Units%20Instances.%26nbsp%3B%20How%20do%20roadmaps%20sit%3F%20Who%20owns%20them%2C%20who%20can%20edit%20and%20update%3F%26nbsp%3B%20I'm%20just%20concerned%20that%20we%20are%20going%20to%20see%20some%20bad%20user%20experiences%20due%20to%20things%20not%20connecting%20to%20what%20they%20user%20is%20allowed%20to%20do%20in%20each%20instance.%26nbsp%3B%20Right%20now%20its%20raising%20more%20concerns%20with%20my%20client%20with%20their%20users%20finding%20it.%26nbsp%3B%20Thanks%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-274169%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-274169%22%20slang%3D%22en-US%22%3E%3CP%3EWhen%20can%20we%20see%20the%20Roadmap%20being%20rolled%20to%20our%20tenants%2C%20at%20least%20in%20terms%20of%20an%20early%20adopters%20%2F%20preview%20program%3F%20We%20are%20cca%20one%20month%20from%20presenting%20management%20IT%20Roadmap%20for%20the%20upcoming%20fiscal%20year%20and%20the%20plan%20to%20trackt%20the%20tasks.%20We%20are%20definitely%20going%20to%20use%20the%20Planner%20%2B%20Teams%20here%2C%20but%20Planner%20is%20GREATLY%20missing%20the%20timeline%20feature%20(the%20Schedule%20View%20is%20really%20almost%20useless%20-%20just%20ask%20anybody).%20We%20could%20use%20the%20Roadmap%20initially%2C%20even%20if%20the%20Planner%20is%20not%20supported%20yet%2C%20but%20it%20would%20have%20to%20allow%20creation%20of%20Rows%20without%20the%20linkage%20to%20the%20Project%20Online.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EAll%20we%20want%20is%20a%20simple%20collaborative%20task%20management%20(Planner%20%2B%20Teams)%2C%20timeline%20view%20(Roadmaps)%20%2B%20eventually%20some%20gant%20graph%20view.%20If%20gant%20graphs%20are%20not%20possible%20on%20Planner%2C%20we%20need%20the%20ability%20for%20Planner%20to%20export%20to%20Excel%2C%20so%20that%20we%20can%20automate%20and%20get%20it%20to%20PowerBI.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-274070%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-274070%22%20slang%3D%22en-US%22%3E%3CP%3EThe%20short%20answer%20is%20yes.%20They%20will%20both%20be%20on%20the%20Common%20Data%20Service%20and%20will%20essentially%20be%20the%20go-to%20project%20management%20tool%20on%20the%20Power%20Platform.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-273460%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-273460%22%20slang%3D%22en-US%22%3E%3CP%3EWill%20modern%20project%20online%20integrate%20with%20PSA%3F%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-272137%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-272137%22%20slang%3D%22en-US%22%3E%3CP%3EYes%2C%20Jukka%20-%20a%20roadmap%20can%20have%20multiple%20rows%20that%20reference%20projects%20in%20different%20PWA%20sites%20within%20your%20tenant.%3C%2FP%3E%0A%3CP%3EBest%20regards%2C%3C%2FP%3E%0A%3CP%3EBrian%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-271431%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-271431%22%20slang%3D%22en-US%22%3E%3CP%3EWill%20Project%20Roadmaps%20support%20multiple%20instances%20of%20Project%20Online%20in%20a%20tenant%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-271072%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-271072%22%20slang%3D%22en-US%22%3E%3CP%3EExciting%20stuff%20in%20the%20POL%20%2B%20PSA%20world!%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-270053%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-270053%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F163372%22%20target%3D%22_blank%22%3E%40Petr%20Kren%C5%BEelok%3C%2FA%3E%26nbsp%3Bwatch%20this%3A%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Fmyignite.techcommunity.microsoft.com%2Fsessions%2F64163%23ignite-html-anchor%22%20target%3D%22_blank%22%20rel%3D%22noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%22%3Ehttps%3A%2F%2Fmyignite.techcommunity.microsoft.com%2Fsessions%2F64163%23ignite-html-anchor%3C%2FA%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EPlanner%20is%20killing%20it!%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-270047%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-270047%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3EThanks%20for%20the%20reply.%20I%20just%20hope%20Planner%20is%20not%20going%20to%20be%20abandoned%2C%20as%20I%20can't%20see%20any%20planned%20roadmap%20features%20for%20it.%20We%20want%20to%20use%20Planner%20as%20kind%20of%20simplified%20means%20of%20watching%20particular%20team%20members%20tasks.%20As%20for%20the%20project%20Home%20%2F%20Roadmap%2C%20which%20I%20can%20see%20being%20mentioned%20on%20the%20web%20-%20is%20there%20any%20place%20where%20we%20could%20learn%20more%20about%20it%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-269998%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-269998%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F163372%22%20target%3D%22_blank%22%3E%40Petr%20Kren%C5%BEelok%3C%2FA%3E%26nbsp%3Bwe%20will%20be%20integrating%20Planner%20into%20Roadmaps%20in%20the%20future%20for%26nbsp%3Bsure.%20As%20the%20new%20Project%20Service%20releases%20we%20will%20provide%20better%20guidance%20on%20when%20Planner%20and%20when%20Project.%20The%20most%20obvious%20difference%26nbsp%3Bwill%20be%26nbsp%3Bthe%20Project%20Scheduling%20engine%20and%20the%20intelligence%20that%20handles%20dependencies.%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-269841%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-269841%22%20slang%3D%22en-US%22%3E%3CP%3EDo%20those%20new%20developments%20affect%20a%20Planner%20in%20any%20way%3F%20We%20would%20like%20to%20use%20Planner%20for%20its%20simplicity%2C%20though%20we%20would%20welcome%20few%20additions%20here%20or%20there.%20Now%20we%20can%20see%20that%20Project%20is%20most%20probably%20becoming%20more%20accessible%20to%20some%20simpler%20scenarios.%20I%20would%20like%20to%20see%2C%20where%20the%20boundary%20and%2For%20possible%20integration%20is%20....%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-269237%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-269237%22%20slang%3D%22en-US%22%3E%3CP%3EDear%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3E!%20Is%20it%20possible%20to%20enter%20the%20early%20adopters%20program%20for%20Roadmaps%3F%20We're%20trying%20to%20create%20our%20internal%20workflows%20with%20Microsoft%20solutions%2C%20and%20we're%20using%20Azure%20DevOps%20and%20O365%2C%20we'd%20like%20to%20try%20out%20Roadmaps!%20Thank%20you.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-269132%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-269132%22%20slang%3D%22en-US%22%3E%3CP%3ELooks%20great%20and%20offers%20more%20value%20to%20users.%20Keep%20going!%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-269045%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-269045%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F10542%22%20target%3D%22_blank%22%3E%40Sean%20Whyment%3C%2FA%3E%26nbsp%3BWe%20don't%20do%20this%20yet%20-%20but%20it%20is%20high%20on%20the%20list%20for%20us%20to%20do%20soon.%20Thanks%20for%20the%20feedback%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-268892%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-268892%22%20slang%3D%22en-US%22%3E%3CP%3EDo%20all%20items%20on%20the%20roadmap%20need%20to%20be%20linked%20to%20underlying%20project%20plans%2Ftasks%2C%20or%20is%20it%20possible%20to%20manually%20create%20items%2Ftasks%20directly%20on%20the%20roadmap%3F%20Thinking%20of%20scenarios%20where%20full%20project%20plans%20might%20not%20exist%2C%20or%20do%20exist%20but%20are%20in%20a%20different%20(non-project%2FAzure)%20tool%20which%20doesn't%20yet%20integrate.%20It%20would%20still%20be%20valuable%20to%20be%20able%20to%20view%20the%20high%20level%20roadmap%20for%20those%20projects%20alongside%20the%20rest%20of%20the%20portfolio.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-501905%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-501905%22%20slang%3D%22en-US%22%3E%3CP%3EHi%20There%2C%3C%2FP%3E%3CP%3EThanks%20for%20your%20help.%3C%2FP%3E%3CP%3Ewhen%20I%20add%20a%20project%20start%2Ffinish%2Ftask%20the%20dates%20show%20in%20US%20date%20format.%20If%20I%20add%20a%20project%20end%20date%2001%2FOct%20it%26nbsp%3Bappears%20as%2010%2FJan.%3C%2FP%3E%3CP%3Eif%20I%20change%20the%20date%20to%2030%2FSep%20still%20shows%20as%2010%2FJan.%20Do%20you%20know%20where%20can%20I%20fix%20this%20issue%3F%20The%20Project%20Online%20date%20format%20has%20been%20set%20to%20AU%20format%20but%20apparently%20I%20need%20to%20fix%20this%20from%20somewhere%20else.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EThanks%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-507202%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-507202%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3E%26nbsp%3B-%20is%20there%20any%20update%20on%20Project%20Roadmaps%20for%20EDU%20tenants%3F%20Our%20EU%20hosted%20EDU%20tenancy%20still%20does%20not%20have%20Project%20listed%20in%20the%20%3CSTRONG%3EServices%20%26amp%3B%20add-ins%3C%2FSTRONG%3E%20section.%20You%20suggested%20Mid-April%20earlier%20in%20the%20comments.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-538540%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-538540%22%20slang%3D%22en-US%22%3EIs%20there%20any%20update%20when%20this%20will%20be%20available%20for%20Project%20Online%20Professional%20and%20Premium%20for%20faculty%20licenses%3F%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-538867%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-538867%22%20slang%3D%22en-US%22%3E%3CP%3ENothing%20yet%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F82446%22%20target%3D%22_blank%22%3E%40Bryan%20Hughes%3C%2FA%3E%26nbsp%3B-%20it%20was%20hoped%20we'd%20already%20be%20there%20but%20hit%20some%20roadblocks.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-670625%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-670625%22%20slang%3D%22en-US%22%3E%3CP%3EHi%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3E%26nbsp%3B%20-%26nbsp%3B%20When%20is%20the%20expected%20availablity%20of%20below%20functionality%20%3A%26nbsp%3B%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3E%3CSPAN%3EDo%20all%20items%20on%20the%20roadmap%20need%20to%20be%20linked%20to%20underlying%20project%20plans%2Ftasks%2C%20or%20is%20it%20possible%20to%20manually%20create%20items%2Ftasks%20directly%20on%20the%20roadmap%3F%20Thinking%20of%20scenarios%20where%20full%20project%20plans%20might%20not%20exist%2C%20or%20do%20exist%20but%20are%20in%20a%20different%20(non-project%2FAzure)%20tool%20which%20doesn't%20yet%20integrate.%20It%20would%20still%20be%20valuable%20to%20be%20able%20to%20view%20the%20high%20level%20roadmap%20for%20those%20projects%20alongside%20the%20rest%20of%20the%20portfolio.%3C%2FSPAN%3E%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3E%3CSPAN%3EThank%20you%2C%3C%2FSPAN%3E%3C%2FP%3E%3CP%3E%3CSPAN%3EStella%3C%2FSPAN%3E%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-675964%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-675964%22%20slang%3D%22en-US%22%3E%3CP%3EAny%20idea%20when%20we%20will%20see%20this%20capability%20in%20GCC-High%3F%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-759496%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-759496%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3E%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F68%22%20target%3D%22_blank%22%3E%40Brian%20Smith%3C%2FA%3E%26nbsp%3BMy%20company%20is%20interested%20in%20rolling%20out%20Roadmap%20at%20an%20Enterprise%20level%20-%20it's%20a%20great%20product.%3C%2FP%3E%3CP%3EHowever%2C%20we%20are%20finding%20that%20the%20Essentials%20license%20does%20not%20actually%20have%20View%20Only%20access%20to%20Roadmaps%20which%20is%20a%20HUGE%20blocker%20to%20adoption%20-%20we%20can't%20afford%20to%20provide%20Pro%20licenses%20to%20everyone%20when%20don't%20need%20that%20level%20of%20access%20otherwise.%3C%2FP%3E%3CP%3ECan%20you%20please%20clarify%20that%20the%20Essentials%20license%20does%20in%20fact%20allow%20Read%20Only%20Access%20to%20Roadmaps%3F%20Do%20you%20have%20an%20official%20Microsoft%20reference%20that%20I%20can%20point%20to%20to%20verify%20this%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-762199%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-762199%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3E%26nbsp%3BThis%20still%20isn't%20in%20our%20EDU%20tenant.%26nbsp%3B%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EAny%20thoughts%20on%20why%3F%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EThanks%3C%2FP%3E%3CP%3EAdrian%3C%2FP%3E%3CBLOCKQUOTE%3E%3CHR%20%2F%3E%3C%2FBLOCKQUOTE%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-785762%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-785762%22%20slang%3D%22en-US%22%3E%3CP%3ECan%20you%20share%20the%20roadmap%20with%20all%20individuals%20in%20your%20organization%20or%20is%20sharing%20restricted%20to%20those%20individuals%20who%20have%20a%20project%20online%20licence%3F%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EThank%20you%2C%3C%2FP%3E%3CP%3EDaniela%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-785772%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-785772%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F386423%22%20target%3D%22_blank%22%3E%40DC-PM%3C%2FA%3Ea%20Project%20Professional%20or%20Project%20Premium%20subscription%20is%20required.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-785798%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-785798%22%20slang%3D%22en-US%22%3E%3CP%3EI%20agree%2C%20if%20Roadmap%20requires%20Project%20Pro%20and%20not%20essentials%20it%20is%20not%20of%20value.%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-785800%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-785800%22%20slang%3D%22en-US%22%3E%3CP%3EThank%20you%20Trutz.%26nbsp%3B%20Like%20one%20of%20the%20post%20mentioned%20above%20the%20licencing%20policy%20for%20Roadmaps%20is%20a%20major%20deterrent%20to%20adopting%20it%20at%20our%20organization.%20%26nbsp%3B%20Since%20project%20team%20members%20may%20be%20licenced%20with%20Project%20Essentials%2C%20wouldn't%20they%20need%20at%20least%20the%20ability%20to%20view%20Roadmap%3F%26nbsp%3B%20As%20a%20project%20manager%2C%20I%20would%20want%20to%20share%20the%20Roadmap%20with%20my%20team%20(at%20the%20very%20least%20the%20ability%20to%20view)%20but%20I%20wouldn't%20necessarily%20licence%20them%20all%20with%20Project%20Professional%20or%20Project%20Premium%20subscriptions.%26nbsp%3B%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-785810%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-785810%22%20slang%3D%22en-US%22%3E%3CP%3EIf%20Microsoft%20Expects%20Roadmap%20to%20be%20accepted%20they%20will%20need%20to%20reconsider%20the%20licensing%20requirements.%20If%20not%20they%20might%20as%20well%20give%20up%20on%20it.%20I%20have%20placed%20my%20deployment%20of%20Roadmap%20on%20hold%20because%20of%20this%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-847932%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-847932%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3E%26nbsp%3B-%20Can%20you%20please%20provide%20an%20update%20when%20Roadmap%20is%20available%20for%20Faculty%20tenants%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-927067%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-927067%22%20slang%3D%22en-US%22%3E%3CP%3Ehey%2C%3C%2FP%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F196869%22%20target%3D%22_blank%22%3E%40Howard%20Crow%3C%2FA%3E%40%20could%20you%20support%20please%3A%20is%20it%20possible%20to%20have%20a%20connection%20to%20multiple%20projects%20from%20Project%20Online%20in%20just%20one%20row%20of%20the%20RoadMap%3F%20Or%20is%20it%20possible%20to%20aggregate%20multiple%20rows%20of%20the%20Roadmap%20into%20one%20area%20%3F%3C%2FP%3E%3CP%3EThank%20you!%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-927429%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-927429%22%20slang%3D%22en-US%22%3E%3CP%3EHey%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F430943%22%20target%3D%22_blank%22%3E%40Tomasz%3C%2FA%3E%2C%3C%2FP%3E%0A%3CP%3EIt%20is%20one%20row%20per%20connected%20project%2C%20you%20can't%20have%201%20row%20with%20tasks%20from%20both%20Project%20A%20and%20Project%20B%20-%20that%20would%20need%20two%20rows%20in%20Roadmap.%3C%2FP%3E%0A%3CP%3EPaul%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-934543%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-934543%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F430943%22%20target%3D%22_blank%22%3E%40Tomasz%3C%2FA%3E%26nbsp%3B%2C%3C%2FP%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F8793%22%20target%3D%22_blank%22%3E%40Paul%20Mather%3C%2FA%3E%26nbsp%3Bis%20right.%20However%2C%20you%20could%20try%20working%20around%20this%20limitation%20by%20using%20Flow%20to%20create%20and%20modify%20key%20dates%20(disconnected%20from%20Project%20tasks)%2C%20you'll%20probably%20need%20some%20sort%20of%20convention%20for%20naming%20them%20since%20there%20are%20only%20a%20date%20and%20a%20title%20field%20available%20-%20something%20like%20%3CPROJECT%20name%3D%22%22%3E%20-%20Unique%20Id.%20%3CTASK%20name%3D%22%22%3E.%20These%20dates%20won't%20look%20like%20tasks%20but%20rather%20like%20pins%20on%20your%20Roadmap%20but%20if%20you%20want%20to%20sync%20major%20milestone%20dates%20form%20multiple%20projects%2C%20this%20may%20work%20out%20for%20you.%20In%20your%20Flow%20that%20can%20be%20triggered%20by%20timer%20or%20publish%20event%20you%20would%20collect%20the%20Major%20Milestones%2C%20search%20for%20them%20in%20your%20roadmap%20key%20dates%20and%20update%20their%20schedule%20(or%20create%20them%20if%20they%20were%20not%20created%20before).%3C%2FTASK%3E%3C%2FPROJECT%3E%3C%2FP%3E%3CP%3EIf%20you%20like%20this%20approach%2C%20a%20good%20place%20for%20you%20to%20start%20is%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F8793%22%20target%3D%22_blank%22%3E%40Paul%20Mather%3C%2FA%3E%26nbsp%3B's%20great%26nbsp%3B%3CA%20title%3D%22post%22%20href%3D%22https%3A%2F%2Fpwmather.wordpress.com%2F2019%2F05%2F27%2Fsync-msproject-roadmap-row-item-status-with-projectonline-task-status-using-microsoftflow-cds-powerplatform-msflow-rest-sharepoint-workmanagement-office365%2F%22%20target%3D%22_blank%22%20rel%3D%22noopener%20nofollow%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%22%3Epost%3C%2FA%3E%26nbsp%3B.%3C%2FP%3E%3CP%3EHope%20this%20helps%2C%3C%2FP%3E%3CP%3ERoy%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-936132%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-936132%22%20slang%3D%22en-US%22%3E%3CP%3EThank%20you%20%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F8793%22%20target%3D%22_blank%22%3E%40Paul%20Mather%3C%2FA%3E%26nbsp%3Band%20%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F4878%22%20target%3D%22_blank%22%3E%40Roy%20Gilboa%3C%2FA%3E%26nbsp%3B.%3C%2FP%3E%3CP%3EWell%20what%20I%20was%20after%20was%20simply%20another%20layer%20of%20grouping%20and%20functional%20workplace%20with%20nice%20visualization%20(exercise%20with%20MS%20FLow%20is%20a%20little%20bit%20to%20much%20for%20me%20%3A)%3C%2Fimg%3E%20)%3C%2FP%3E%3CP%3EMy%20organization%20runs%20projects%20in%20Project%20Online%20already%2C%20we%20have%20our%20RoadMap%20for%20the%20next%203%20years%20and%207%20focus%20areas%20and%20we%20would%20like%20to%20have%20it%20all%20visible%20in%20one%20working%20place%3A%20Roadmap%20%26gt%3B%26gt%3B%26gt%3B%207%20areas%20%26gt%3B%26gt%3B%26gt%3B%20projects%20connected%20to%20each%20area.%3C%2FP%3E%3CP%3ESo%20in%20that%20case%20I%20would%20have%20to%20create%20like%207%20separate%20Roadmaps...%3C%2FP%3E%3CP%3EThank%20you%3C%2FP%3E%3CP%3ETomek%26nbsp%3B%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-937159%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-937159%22%20slang%3D%22en-US%22%3E%3CP%3EHi%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F430943%22%20target%3D%22_blank%22%3E%40Tomasz%3C%2FA%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EHow%20come%20you%20cant%20just%20create%201%20roadmap%20with%20multiple%20rows%20on%20the%20roadmap%20for%20each%20project%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-943536%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-943536%22%20slang%3D%22en-US%22%3E%3CP%3EHey%20%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F8793%22%20target%3D%22_blank%22%3E%40Paul%20Mather%3C%2FA%3E%26nbsp%3B-%20off%20course%20I%20can%20create%20RoadMap%20with%20multiple%20rows%2C%20my%20problem%20is%20that%201%20row%20%3D%201%20project%20while%20I%20would%20like%20to%20connect%20multiple%20projects%20with%20one%201%20row.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-944120%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-944120%22%20slang%3D%22en-US%22%3E%3CP%3EHi%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F430943%22%20target%3D%22_blank%22%3E%40Tomasz%3C%2FA%3E%26nbsp%3B-%20I%20understand%20what%20you%20are%20asking%20-%20but%20the%20design%20is%20that%20one%20Roadmap%20contains%20many%20rows%20depending%20on%20the%20source%20of%20the%20deliverable%20(individual%20Projects%20or%20Azure%20Devops).%26nbsp%3B%20This%20is%20one%20Roadmap.%26nbsp%3B%20So%20for%20you%20example%20you%20don't%20have%207%20Roadmaps%20-%20you%20have%20one%20Roadmap.%26nbsp%3B%20The%20challenge%20with%20your%20suggested%20design%20is%20that%20you%20would%20then%20need%20some%20other%20indicator%20of%20the%20source%20of%20each%20plan%20if%20they%20were%20all%20adding%20elements%20into%20the%20same%20row.%26nbsp%3B%20I%20haven't%20tried%20-%20but%20if%20you%20have%20a%20master%20project%20aggregating%20your%207%20areas%20-%20could%20you%20add%20rows%20from%20that%20master%20into%20one%20row%20in%20Roadmap%20perhaps%3F%3C%2FP%3E%0A%3CP%3EBest%20regards%2C%3C%2FP%3E%0A%3CP%3EBrian%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-945311%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-945311%22%20slang%3D%22en-US%22%3E%3CP%3EHi%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F430943%22%20target%3D%22_blank%22%3E%40Tomasz%3C%2FA%3E%2C%3C%2FP%3E%0A%3CP%3EI've%20tried%20what%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F68%22%20target%3D%22_blank%22%3E%40Brian%20Smith%3C%2FA%3E%26nbsp%3Bsuggested%20but%20I%20can't%20add%20tasks%20from%20the%20sub%20project%20once%20I've%20added%20the%20Master%20project%20to%20the%20row%2C%20you%20can%20only%20add%20tasks%20from%20the%20Master%20project%20or%20the%20sub%20project%20itself.%20I%20would%20recommend%20raising%20an%20idea%20on%20the%20roadmap%20user%20voice%3A%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Fmicrosoftproject.uservoice.com%2Fforums%2F914203-project%3Fcategory_id%3D358186%22%20target%3D%22_blank%22%20rel%3D%22noopener%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%20noopener%20noreferrer%22%3Ehttps%3A%2F%2Fmicrosoftproject.uservoice.com%2Fforums%2F914203-project%3Fcategory_id%3D358186%3C%2FA%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EPaul%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-946605%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-946605%22%20slang%3D%22en-US%22%3E%3CP%3EThanks%26nbsp%3B%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F8793%22%20target%3D%22_blank%22%3E%40Paul%20Mather%3C%2FA%3E%26nbsp%3B%2C%20and%20I%20did%20wonder%20if%20that%20would%20be%20the%20case.%26nbsp%3B%20Could%20you%20have%20a%20master%20project%20task%20that%20was%20driven%20by%20the%20sub%20project%20and%20use%20that%20maybe%3F%26nbsp%3B%20And%20yes%2C%20UserVoice%20is%20a%20great%20place%20to%20raise%20this.%3C%2FP%3E%20%3CP%3EBrian%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-959028%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-959028%22%20slang%3D%22en-US%22%3E%3CP%3EThanks%20%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F68%22%20target%3D%22_blank%22%3E%40Brian%20Smith%3C%2FA%3E%26nbsp%3Band%20%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F8793%22%20target%3D%22_blank%22%3E%40Paul%20Mather%3C%2FA%3E%26nbsp%3B-%20I%20have%20posted%20my%20suggestion%20on%20UserVoice%2C%20keep%20my%20fingers%20crossed!%3C%2FP%3E%3CP%3ETomek%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-1108116%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1108116%22%20slang%3D%22en-US%22%3E%3CP%3EHi.%20This%20announcement%20was%20made%20in%20October%202018%20can%20someone%20from%20Microsoft%20please%20clarify%20when%20this%20will%20be%20available%20to%20Education%20Licenses%20as%20we%20are%20now%20Jan%202020%3F%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-1112847%22%20slang%3D%22en-US%22%3ERe%3A%20Announcing%20Project%20Roadmaps%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1112847%22%20slang%3D%22en-US%22%3E%3CP%3EThanks%20for%20this%20article%2C%20you%20have%20explained%20MS%20Project%20Online%20quite%20well.%20It%20would%20be%20great%20if%20you%20can%20provide%20information%20features%20of%20%3CA%20href%3D%22https%3A%2F%2Fwww.o365cloudexperts.com%2Foffice-365-project%2F%22%20target%3D%22_blank%22%20rel%3D%22noopener%20nofollow%20noopener%20noreferrer%20noopener%20noreferrer%22%3EMS%20Project%20Online%3C%2FA%3E%20and%20pricing%3F%3C%2FP%3E%3CP%3EThanks%20in%20advance.%3C%2FP%3E%3CP%3ERegards%2C%3C%2FP%3E%3CP%3ELewis%3C%2FP%3E%3C%2FLINGO-BODY%3E
Microsoft

On September 24th at Microsoft Ignite, we announced a new feature for Microsoft Project called Roadmap. Roadmap is a visually exciting way to combine information from multiple Waterfall and Agile projects and share it with co-workers.

 

Roadmaps are available directly on the new Project Home page that we released into production this Summer.

 

Check it out at project.microsoft.com

 

 

home.PNG

 

They are easily created from the Project Home page and appear nearly instantly. Performance has been an important tenet of the Roadmap feature

new.PNG

 

Once the Roadmap is completed, it provides a visual and interactive way to view project status across a program or portfolio.

 

Roadmap.PNG

 

Building out a Roadmap is a fairly simple process. Merely add rows, connect them to projects and then choose what tasks, milestones, features or initiatives you want to bubble up to the Roadmap. After creating a row, pick a project type first. In our initial release, we will support Project Online projects and Azure Boards projects. Over time we will add different project types as we better understand what customer’s needs. We use the Microsoft Flow connector infrastructure for our project types, so it is a very powerful and flexible connection system.

new row.PNG

 

After choosing a project type, the user chooses a project and signs into that project. Microsoft Flow manages all the credentials in a compliant way.

 

connect using flow.PNG

 

Once the tasks are on the Roadmap, they can be assigned a status by the Roadmap manager. This is independent of the backend project and can be managed by the roadmap owner for reporting.

After that, its merely a matter of choosing what tasks to show on the roadmap.

 

set status.PNG

 

 

 

If a task is marked as at risk, a user might need to drill through to the backing task in the original system. The Roadmap maintains a link to the original task so users can always click through to the ‘system of record’.

 

details.PNG

 

In addition to including tasks from back end systems, users may also add Key Dates to the Roadmap. These dates show up at the top of the roadmap and provide a visualization of important dates that span across projects – like a launch date or big marketing event.

 

 

keydate.PNG

 

Finally, after the Roadmap has been completed, the author will want to share the roadmap. Roadmaps are shared using Office Modern Groups. Once a roadmap is shared a Modern Group is created to back the Roadmap and provide additional collaborative capabilities. A user can also choose to share the roadmap with an existing Modern Group that they might be working with.

Group.PNG

 

 

 

 

That is a brief overview of the new Project Roadmap feature. We will be releasing the feature to our early adopter program shortly. When we all agree its ready for all our customers, we will begin rolling it out to the rest of our Project Online customers. Keep an eye out for the new Roadmap!

Cheers,

Howard

 

 

 

 

123 Comments
Frequent Contributor

Nothing yet @Bryan Hughes - it was hoped we'd already be there but hit some roadblocks.

Occasional Visitor

Hi @Howard Crow  -  When is the expected availablity of below functionality : 

 

Do all items on the roadmap need to be linked to underlying project plans/tasks, or is it possible to manually create items/tasks directly on the roadmap? Thinking of scenarios where full project plans might not exist, or do exist but are in a different (non-project/Azure) tool which doesn't yet integrate. It would still be valuable to be able to view the high level roadmap for those projects alongside the rest of the portfolio.

 

Thank you,

Stella

Regular Visitor

Any idea when we will see this capability in GCC-High? 

Occasional Visitor

@Howard Crow @Brian Smith My company is interested in rolling out Roadmap at an Enterprise level - it's a great product.

However, we are finding that the Essentials license does not actually have View Only access to Roadmaps which is a HUGE blocker to adoption - we can't afford to provide Pro licenses to everyone when don't need that level of access otherwise.

Can you please clarify that the Essentials license does in fact allow Read Only Access to Roadmaps? Do you have an official Microsoft reference that I can point to to verify this?

New Contributor

@Howard Crow This still isn't in our EDU tenant. 

 

Any thoughts on why?

 

Thanks

Adrian


Occasional Visitor

Can you share the roadmap with all individuals in your organization or is sharing restricted to those individuals who have a project online licence?

 

Thank you,

Daniela

Contributor

@DC-PMa Project Professional or Project Premium subscription is required.

Regular Visitor

I agree, if Roadmap requires Project Pro and not essentials it is not of value. 

Occasional Visitor

Thank you Trutz.  Like one of the post mentioned above the licencing policy for Roadmaps is a major deterrent to adopting it at our organization.   Since project team members may be licenced with Project Essentials, wouldn't they need at least the ability to view Roadmap?  As a project manager, I would want to share the Roadmap with my team (at the very least the ability to view) but I wouldn't necessarily licence them all with Project Professional or Project Premium subscriptions. 

 

 

Regular Visitor

If Microsoft Expects Roadmap to be accepted they will need to reconsider the licensing requirements. If not they might as well give up on it. I have placed my deployment of Roadmap on hold because of this

Occasional Visitor

@Howard Crow - Can you please provide an update when Roadmap is available for Faculty tenants?

Regular Visitor

hey,

@Howard Crow@ could you support please: is it possible to have a connection to multiple projects from Project Online in just one row of the RoadMap? Or is it possible to aggregate multiple rows of the Roadmap into one area ?

Thank you!

Hey @Tomasz,

It is one row per connected project, you can't have 1 row with tasks from both Project A and Project B - that would need two rows in Roadmap.

Paul

New Contributor

@Tomasz ,

@Paul Mather is right. However, you could try working around this limitation by using Flow to create and modify key dates (disconnected from Project tasks), you'll probably need some sort of convention for naming them since there are only a date and a title field available - something like <Project Name> - Unique Id. <Task Name>. These dates won't look like tasks but rather like pins on your Roadmap but if you want to sync major milestone dates form multiple projects, this may work out for you. In your Flow that can be triggered by timer or publish event you would collect the Major Milestones, search for them in your roadmap key dates and update their schedule (or create them if they were not created before).

If you like this approach, a good place for you to start is @Paul Mather 's great post .

Hope this helps,

Roy

Regular Visitor

Thank you @Paul Mather and @Roy Gilboa .

Well what I was after was simply another layer of grouping and functional workplace with nice visualization (exercise with MS FLow is a little bit to much for me :) )

My organization runs projects in Project Online already, we have our RoadMap for the next 3 years and 7 focus areas and we would like to have it all visible in one working place: Roadmap >>> 7 areas >>> projects connected to each area.

So in that case I would have to create like 7 separate Roadmaps...

Thank you

Tomek  

Hi @Tomasz 

How come you cant just create 1 roadmap with multiple rows on the roadmap for each project?

Regular Visitor

Hey @Paul Mather - off course I can create RoadMap with multiple rows, my problem is that 1 row = 1 project while I would like to connect multiple projects with one 1 row.

Frequent Contributor

Hi @Tomasz - I understand what you are asking - but the design is that one Roadmap contains many rows depending on the source of the deliverable (individual Projects or Azure Devops).  This is one Roadmap.  So for you example you don't have 7 Roadmaps - you have one Roadmap.  The challenge with your suggested design is that you would then need some other indicator of the source of each plan if they were all adding elements into the same row.  I haven't tried - but if you have a master project aggregating your 7 areas - could you add rows from that master into one row in Roadmap perhaps?

Best regards,

Brian

Hi @Tomasz,

I've tried what @Brian Smith suggested but I can't add tasks from the sub project once I've added the Master project to the row, you can only add tasks from the Master project or the sub project itself. I would recommend raising an idea on the roadmap user voice: https://microsoftproject.uservoice.com/forums/914203-project?category_id=358186 

Paul

Frequent Contributor

Thanks @Paul Mather , and I did wonder if that would be the case.  Could you have a master project task that was driven by the sub project and use that maybe?  And yes, UserVoice is a great place to raise this.

Brian

Regular Visitor

Thanks @Brian Smith and @Paul Mather - I have posted my suggestion on UserVoice, keep my fingers crossed!

Tomek

Occasional Visitor

Hi. This announcement was made in October 2018 can someone from Microsoft please clarify when this will be available to Education Licenses as we are now Jan 2020?

Microsoft

I am trying to connect a 'Row' to the Azure DevOps instance that my team is using. However, when I try to connect a 'Row' to the Devops instance, even though it shows up in the drop-down, I keep getting an error saying 'Something went wrong. Please try again'. Which isnt very helpful.

 

I have searched online quite a bit but not able to find a solution. Does anyone have any recommendations?