SOLVED
Home

"Submit project" button skips to next phase and does not go through stages

%3CLINGO-SUB%20id%3D%22lingo-sub-878568%22%20slang%3D%22en-US%22%3ERe%3A%20%22Submit%20project%22%20button%20skips%20to%20next%20phase%20and%20does%20not%20go%20through%20stages%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-878568%22%20slang%3D%22en-US%22%3E%3CP%3E%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F397476%22%20target%3D%22_blank%22%3E%40Marinpetersen%3C%2FA%3E%26nbsp%3BClearly%20you%20have%20used%20%222%22%20two%20times%3C%2FP%3E%3CP%3E%3CSTRONG%3E2%3C%2FSTRONG%3E-%20When%20a%20project%20is%20submitted%2C%20go%20to%3A%20stage%202.2%3C%2FP%3E%3CP%3E%3CSTRONG%3E2%3C%2FSTRONG%3E-%20When%20a%20project%20is%20submitted%2C%20go%20to%3A%20stage%203.1%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3ESo%20it%20can%20go%20to%203.1%20directly%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-876940%22%20slang%3D%22en-US%22%3E%22Submit%20project%22%20button%20skips%20to%20next%20phase%20and%20does%20not%20go%20through%20stages%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-876940%22%20slang%3D%22en-US%22%3E%3CP%3EHi%26nbsp%3B%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EI%20am%20very%20new%20at%20working%20with%20sharepoint%20and%20workflows.%3C%2FP%3E%3CP%3EBut%20could%20someone%20point%20out%20for%20me%20what%20I%20am%20doing%20wrong%20when%20my%20%22submit%22%20button%20skips%20to%20the%20first%20stage%20in%20the%20next%20phase%2C%20and%20does%20not%20go%20to%20the%20next%20stage%20in%20the%20current%20phase%3F%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EI%20have%20created%20a%20workflow%20that%20looks%20like%20this%3A%3C%2FP%3E%3CP%3E0-%20Start%20at%20Stage%201%3C%2FP%3E%3CP%3E1-%20When%20a%20project%20is%20submitted%2C%20go%20to%3A%20stage%202.1%3C%2FP%3E%3CP%3E2-%20When%20a%20project%20is%20submitted%2C%20go%20to%3A%20stage%202.2%3C%2FP%3E%3CP%3E3-%20When%20a%20project%20is%20submitted%2C%20go%20to%3A%20stage%203.1%3C%2FP%3E%3CP%3E4-%20When%20a%20project%20is%20submitted%2C%20go%20to%3A%20stage%203.2%3C%2FP%3E%3CP%3E5-%20When%20a%20project%20is%20submitted%2C%20go%20to%3A%20stage%204%3CBR%20%2F%3E%3CBR%20%2F%3EBut%20when%20I%20submit%20a%20project%20in%20stage%202.1%2C%20it%20jumps%20to%20the%20next%20stage%2C%203.1.%20And%20does%20not%20include%202.2.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EHopefully%20someone%20out%20there%20can%20correct%20my%20flow.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EAll%20the%20best%2C%20Marin%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-LABS%20id%3D%22lingo-labs-876940%22%20slang%3D%22en-US%22%3E%3CLINGO-LABEL%3ESharePoint%3C%2FLINGO-LABEL%3E%3CLINGO-LABEL%3ESharePoint%20Designer%202013%3C%2FLINGO-LABEL%3E%3CLINGO-LABEL%3EWorkflow%3C%2FLINGO-LABEL%3E%3C%2FLINGO-LABS%3E%3CLINGO-SUB%20id%3D%22lingo-sub-878590%22%20slang%3D%22en-US%22%3ERe%3A%20%22Submit%20project%22%20button%20skips%20to%20next%20phase%20and%20does%20not%20go%20through%20stages%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-878590%22%20slang%3D%22en-US%22%3EHi%20%3CA%20href%3D%22https%3A%2F%2Ftechcommunity.microsoft.com%2Ft5%2Fuser%2Fviewprofilepage%2Fuser-id%2F410289%22%20target%3D%22_blank%22%3E%40SinhaKislay%3C%2FA%3E%20%2C%3CBR%20%2F%3E%3CBR%20%2F%3ESorry%20I%20think%20this%20is%20just%20a%20typo%20on%20my%20side%2C%20I%20have%20corrected%20it%20now%20in%20the%20conversation.%3CBR%20%2F%3EI%20have%20included%20a%20picture%20of%20the%20workflow%2C%20it%20goes%20from%20stade%202.1%20to%202.2%2C%20and%20from%202.2%20to%203.1.%3CBR%20%2F%3E%3CBR%20%2F%3EBut%20thank%20you%20for%20the%20correction%20in%20the%20text.%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-878604%22%20slang%3D%22en-US%22%3ERe%3A%20%22Submit%20project%22%20button%20skips%20to%20next%20phase%20and%20does%20not%20go%20through%20stages%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-878604%22%20slang%3D%22en-US%22%3E%3CP%3EOf%20course%20there%20was%20a%20logical%20reason%20for%20this%2C%20I%20just%20had%20to%20be%20patient%20and%20publish%20the%20workflow%2C%20wait%20for%20a%20while%20and%20then%20restart%20the%20workflow.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EI%20noticed%20when%20starting%20a%20new%20project.%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EBest%20regards%2C%20Worflow%20newbie.%3C%2FP%3E%3C%2FLINGO-BODY%3E
Highlighted
Occasional Contributor

Hi 

 

I am very new at working with sharepoint and workflows.

But could someone point out for me what I am doing wrong when my "submit" button skips to the first stage in the next phase, and does not go to the next stage in the current phase?

 

I have created a workflow that looks like this:

0- Start at Stage 1

1- When a project is submitted, go to: stage 2.1

2- When a project is submitted, go to: stage 2.2

3- When a project is submitted, go to: stage 3.1

4- When a project is submitted, go to: stage 3.2

5- When a project is submitted, go to: stage 4

But when I submit a project in stage 2.1, it jumps to the next stage, 3.1. And does not include 2.2.

 

Hopefully someone out there can correct my flow.

 

All the best, Marin

3 Replies
Highlighted

@Marinpetersen Clearly you have used "2" two times

2- When a project is submitted, go to: stage 2.2

2- When a project is submitted, go to: stage 3.1

 

So it can go to 3.1 directly

Highlighted
Hi @SinhaKislay ,

Sorry I think this is just a typo on my side, I have corrected it now in the conversation.
I have included a picture of the workflow, it goes from stade 2.1 to 2.2, and from 2.2 to 3.1.

But thank you for the correction in the text.
Highlighted
Solution

Of course there was a logical reason for this, I just had to be patient and publish the workflow, wait for a while and then restart the workflow.

 

I noticed when starting a new project.

 

Best regards, Worflow newbie.

Related Conversations
MS Project - Impression GANTT + Ressources
Emmanuel57570 in Project on
0 Replies
Disabled Project
Jlohoua in Project on
0 Replies
I need help with custom reports MS Project
Missy1993 in Project on
0 Replies
group of ressources on microsoft project
fgeneau in Project on
0 Replies