%3CLINGO-SUB%20id%3D%22lingo-sub-216626%22%20slang%3D%22en-US%22%3EChoosing%20unique%20Planner%20task%20in%20Flow%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-216626%22%20slang%3D%22en-US%22%3E%3CP%3ENot%20sure%20if%20this%20is%20a%20Planner%20issue%20or%20a%20Flow%20issue%2C%20but%20hopefully%20someone%20who%20needs%20to%20see%20this%20will%20see%20it%20here.%20I'm%20looking%20at%20this%20Flow%20template%20to%20update%20a%20Planner%20task%20on%20a%20scheduled%20basis.%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%3CA%20href%3D%22https%3A%2F%2Faustralia.flow.microsoft.com%2Fen-us%2Fgalleries%2Fpublic%2Ftemplates%2F8b042620ad844a6d95c732b5db81d798%2Fon-scheduled-intervals-update-planner-tasks%2F%22%20target%3D%22_blank%22%20rel%3D%22noopener%20noreferrer%20noopener%20noreferrer%22%3Ehttps%3A%2F%2Faustralia.flow.microsoft.com%2Fen-us%2Fgalleries%2Fpublic%2Ftemplates%2F8b042620ad844a6d95c732b5db81d798%2Fon-scheduled-intervals-update-planner-tasks%2F%3C%2FA%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3EThe%20%22unique%20identifier%22%20drop%20down%20does%20not%20present%20unique%20values%2C%20so%20it's%20not%20really%20possible%20to%20choose%20the%20task%20to%20update%20if%20you've%20got%20a%20lot%20of%20similar%20task%20names%20(which%20I%20do%20because%20I%20was%20using%20Planner%20to%20run%20multiple%20projects%20using%20a%20standard%20project%20template%20of%20mine).%3C%2FP%3E%0A%3CP%3E%3CSPAN%20class%3D%22lia-inline-image-display-wrapper%20lia-image-align-center%22%20style%3D%22width%3A%20609px%3B%22%3E%3CIMG%20src%3D%22https%3A%2F%2Fgxcuf89792.i.lithium.com%2Ft5%2Fimage%2Fserverpage%2Fimage-id%2F37844iD8DF867BDEEF1B44%2Fimage-size%2Flarge%3Fv%3D1.0%26amp%3Bpx%3D999%22%20alt%3D%22unique.jpg%22%20title%3D%22unique.jpg%22%20%2F%3E%3C%2FSPAN%3E%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%0A%3CP%3E%26nbsp%3B%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-SUB%20id%3D%22lingo-sub-216670%22%20slang%3D%22en-US%22%3ERe%3A%20Choosing%20unique%20Planner%20task%20in%20Flow%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-216670%22%20slang%3D%22en-US%22%3ETo%20me%20is%20more%20a%20Flow%20issue...something%20also%20to%20take%20into%20account%20is%20that%20the%20Update%20a%20task%20in%20Planner%20is%20still%20in%20preview%3C%2FLINGO-BODY%3E
Highlighted
Regular Contributor

Not sure if this is a Planner issue or a Flow issue, but hopefully someone who needs to see this will see it here. I'm looking at this Flow template to update a Planner task on a scheduled basis.

 

https://australia.flow.microsoft.com/en-us/galleries/public/templates/8b042620ad844a6d95c732b5db81d7...

 

The "unique identifier" drop down does not present unique values, so it's not really possible to choose the task to update if you've got a lot of similar task names (which I do because I was using Planner to run multiple projects using a standard project template of mine).

unique.jpg

 

 

 

1 Reply
Highlighted
To me is more a Flow issue...something also to take into account is that the Update a task in Planner is still in preview