I hope this is the right place to ask, but I have an issue with Power Point. When I create a graph, Power Point won't let me change the axes (Bounds) Minimum and Maximum, also Units, Major and Minor, which are always in Auto and it doesn´t allow me to change it. I can enter a value into the respective fields (x minimum/maximum, y minimum/maximum), but when I hit enter to confirm the value, it simply changes back to the original.
Does anyone have any ideas on how to fix this?
Office 365