horizontal bar graph

%3CLINGO-SUB%20id%3D%22lingo-sub-2015654%22%20slang%3D%22en-US%22%3Ehorizontal%20bar%20graph%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-2015654%22%20slang%3D%22en-US%22%3E%3CP%3EHi!%20I%20have%20a%20created%20a%20horizontal%20bar%20graph.%20X%20axis%20is%20study%20days%20of%20a%20clinical%20trial%20and%20Y%20axis%20is%20patients.%20How%20do%20I%20make%20individual%20bar%20start%20at%20specific%20day%20such%20as%2021%20or%2042%20instead%20of%20day%200%3F%20I%20attached%20my%20graph%20and%20am%20really%20struggling%20here%20to%20figure%20this%20out.%20Currently%2C%20all%20the%20patients%20start%20on%20day%200%2C%20which%20is%20not%20correct.%20I%20appreciate%20any%20guidance.%20Thanks!%3C%2FP%3E%3C%2FLINGO-BODY%3E
New Contributor

Hi! I have a created a horizontal bar graph. X axis is study days of a clinical trial and Y axis is patients. How do I make individual bar start at specific day such as 21 or 42 instead of day 0? I attached my graph and am really struggling here to figure this out. Currently, all the patients start on day 0, which is not correct. I appreciate any guidance. Thanks!

0 Replies