We have exchange 2010SP2 and domain controller server 2008R2 and planing for Hybrid migration with domain. Controller migration to 2022
I am planing the below steps and need advise
1- upgrade exchange 2010 SP2 to SP3
2- do the cutover migration onshot all mailbox migration and
3- change Mx record
4- demote the exchange 2010 servers
5-after exchange migration now i can upgrade the 2008 R2 to direct 2022 or need to do first Domain controller server 2016 and after server 2016 to server 2022 is it correct?