how to assemble the data in one line in Power Bi

%3CLINGO-SUB%20id%3D%22lingo-sub-1633986%22%20slang%3D%22en-US%22%3Ehow%20to%20assemble%20the%20data%20in%20one%20line%20in%20Power%20Bi%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-1633986%22%20slang%3D%22en-US%22%3E%3CP%3EHi%20i%20Have%20data%20in%20power%20bi%20which%20i%20need%20to%20assemble%20in%20Stopped%20first%20and%20then%20moving.%20I%20am%20able%20to%20achieve%20upto%20below%20attached.%20What%20i%20need%20to%20calculate%20the%20event%20first%20start%20to%20next%20stop.%20If%20possible%20i%20could%20bring%20them%20into%20one%20line%20that%20would%20be%20great.%20I%20have%20colour%20coded%20each%20event%20which%20needs%20to%20be%20matched.%3C%2FP%3E%3C%2FLINGO-BODY%3E%3CLINGO-LABS%20id%3D%22lingo-labs-1633986%22%20slang%3D%22en-US%22%3E%3CLINGO-LABEL%3EPower%20BI%3C%2FLINGO-LABEL%3E%3C%2FLINGO-LABS%3E
Occasional Contributor

Hi i Have data in power bi which i need to assemble in Stopped first and then moving. I am able to achieve upto below attached. What i need to calculate the event first start to next stop. If possible i could bring them into one line that would be great. I have colour coded each event which needs to be matched.

0 Replies