Jan 03 2019 07:17 AM
I would like to carry my timesheet totals from one pay period to the next one without compromising the formals already in place. I have everything set to keep track of time used and want to carry from one spreadsheet (in the same document) to another. How do I do it?
Jan 03 2019 11:43 AM
Hello,
this is hard to answer without more detail about the data structure. Can you post a sample file? Mock up the desired results manually and describe the logic that leads to these results.