Excel calculation of time in step

Copper Contributor

I’m trying to calculate the amount of time that an item (part) was in each particular Step (highlighted in yellow); beginning with “recdate”, then progressing through each step 01, 03, 05, 08, 09, 10, 13, 15, 1555, 16, 17, 20 and ending with step 18.  The problem I’m having is that some of the items (parts), don’t move through every step.  How do I calculate the time with the blank cells?

wonocustnocsritemdescripmanufdeptworkreqorig_scopeponumsernorecdatewoqodateqoaprvdteshipdateawbnoin_housestep_01step_03step_05step_08step_09step_10step_13step_15step_1555step_16step_17step_20step_18
  332225120212AB8TJ163AAB1N1 SPEED SENAMETEKEL3SIHRP4195141B74C9/1/20209/8/202012/9/20214/1/2022SIH57709/01/20 14:3009/02/20 06:27     09/08/20 11:10 09/08/20 13:0309/08/20 13:0412/09/21 15:0604/01/22 08:01
  338820220699EGQA03558ISS8INDICATOR-CLCFMIFLPSIHRP784786-1RC12-45393/4/20214/4/20213/28/20224/1/2022SIH39303/04/21 14:2303/05/21 06:32     03/10/21 10:27 03/10/21 12:0204/06/21 21:2903/29/22 08:2904/01/22 08:05
  344847040535EG41F1005LUBRICATIONSAFRANFLPSIHTEST4701199338YT0064607/15/20211/22/202211/24/20214/1/2022SIH26007/15/21 14:3003/18/22 10:4511/18/21 07:20      03/28/22 11:1303/30/22 11:10 04/01/22 08:02
  353215140882LR55022001-11COOLERSUMITOMOFCLOHRP7500264318-10303861/19/20223/16/20224/1/20224/1/20225349776165517201/27/22 11:5803/11/22 07:3703/19/22 06:5703/21/22 11:1803/21/22 11:25 03/28/22 11:4403/30/22 06:34 03/30/22 08:0804/01/22 09:3003/30/22 11:3704/01/22 10:19
  353821070237EG41F1005LUBRICATIONSAFRANFLPOHTESTW285385YT0074731/28/20222/2/20222/22/20224/1/20225349776165626301/28/22 13:0401/29/22 07:2602/21/22 05:1403/03/22 11:1103/03/22 13:3803/04/22 05:5903/30/22 08:0303/31/22 09:51 03/31/22 13:5604/01/22 09:14 04/01/22 10:19
  355134180049AB85465-2ROTORMEGGITTEL1SIHRPRS42566601R833G2/23/20223/22/20223/25/20224/1/2022SIH3702/23/22 13:5202/25/22 09:19      03/17/22 08:4603/17/22 10:4203/17/22 15:1203/29/22 08:2104/01/22 08:05
  355193211073EG41F9003OIL SCAVENGECFMIFSPSIHRPP2420324-1YT1185012/26/20223/11/20223/11/20224/1/2022SIH3403/21/22 11:2403/21/22 11:5903/11/22 11:1703/14/22 10:1703/14/22 11:15 03/14/22 11:2803/18/22 06:55 03/24/22 12:3804/05/22 14:08 04/05/22 14:08
  355216011387EG45731-1382SERVO FUEL HMEGGITTFCLOHINSP1300321YB004176-72/26/20223/19/20223/30/20224/1/20225349776165843403/07/22 12:4503/18/22 11:4703/14/22 08:4003/30/22 14:2703/31/22 05:48 03/31/22 05:5703/31/22 12:59 03/31/22 14:3903/31/22 16:10 04/01/22 10:20
  355363011531EG3269264-10ACTUATOR FEEHONEYWELCDUSIHOH211121GRTC02673/1/20223/30/20223/30/20224/1/2022SIH3103/01/22 12:3103/29/22 14:2203/07/22 14:48      03/30/22 10:4503/31/22 08:08 04/01/22 08:08
  355436040538JJ607999-00JUNCTION BOXAMETEKEL3SIHINSP4701260282GDBFK09R3/2/20223/16/2022  -   -4/1/2022SIH3003/02/22 13:2203/03/22 11:03     03/15/22 15:54 03/16/22 06:3203/16/22 10:2203/16/22 12:1604/01/22 08:09
  355583012041AB144-186-000-011ACCELEROMETEMEGGITTEL3SIHRP3614765MA462209-K3/5/20223/24/20223/25/20224/1/2022SIH2703/05/22 07:2503/07/22 07:38     03/23/22 13:12 03/23/22 14:2203/24/22 04:4203/29/22 08:2404/01/22 08:03
  355636210378LR41F1205DMS DETECTORCFMIFLPSIHTEST0014336238YT0469043/7/20223/16/20223/31/20224/1/2022SIH2503/07/22 11:1403/07/22 15:19       03/14/22 13:4803/16/22 09:0503/30/22 15:1704/01/22 08:01
  355741020333EG340-400-303-0OIL SCAVENGECFMIFSPOHTESTRO485YT023204-T3/9/20223/29/20223/29/20224/1/20225349776165952303/09/22 07:1003/09/22 09:2903/24/22 13:3203/29/22 20:4003/30/22 06:02 03/30/22 07:3003/31/22 15:09 03/31/22 15:1003/31/22 16:07 04/01/22 10:20
  355747020100AB16844-000FUEL COOLEDAMETEKFCLSIHTESTRO102736071713/9/20223/22/20223/24/20224/1/2022SIH2303/10/22 15:2703/14/22 13:04       03/18/22 09:4303/21/22 06:3203/29/22 08:2604/01/22 08:03
2 Replies
Are the date-times in each of the Step_* columns the date and time at which that step was completed or at which it started?

So, should the difference between step_01 and recdate be considered the time taken from step 1?

@flexyourdata the date and timestamp in the Step columns are the date and time that it entered that step.

Thanks!