I have configured ASR with 4 vCPUs and CPU is running almost 90 to 100%. Does anyone see any issue of increasing CPUs from 4 to 8 or 12 vCPUs?  ASR VM is running on VMware.

 

thanks,

3 Replies

No issues at all upgrading the server. The recommended across the board for CPU's on your configuration server is at least 8. This goes for Hyper-V, VMware and Physical. That is the minimum so if you scale that up your are going to be able to dial down your RPO and RTO times. I will include the link below for the minimum requirements for the VMWare environments. Please reach out if you have any questions.

 

https://docs.microsoft.com/en-us/azure/site-recovery/vmware-azure-configuration-server-requirements

 

@Hitesh Patel 

Hi,
Thanks. I should have said dual CPU with 4 core on each so in total I have 8 cores. I like to increase to 16 cores. Do you see any issues?

No issue at all with upgrading that CPU count sir! @Hitesh Patel