Can I track product backlog item after sending it to another team's area

%3CLINGO-SUB%20id%3D%22lingo-sub-3397432%22%20slang%3D%22en-US%22%3ECan%20I%20track%20product%20backlog%20item%20after%20sending%20it%20to%20another%20team's%20area%3C%2FLINGO-SUB%3E%3CLINGO-BODY%20id%3D%22lingo-body-3397432%22%20slang%3D%22en-US%22%3E%3CP%3EI%20have%20two%20product%20teams%20X%20and%20Y%20and%20these%20product%20teams%20do%20work%20with%20Service%20teams%20A%2C%20B%20and%20C.%3C%2FP%3E%3CP%3EDuring%20planning%20we%20plan%20for%20Product%20team%20X%20and%20Y%20but%20later%20the%20work%20flows%20out%20to%20services%20team%20A%2C%20B%20and%20C.%20which%20means%20we%20change%20the%20area%20path%20and%20iteration%20of%20the%20work%20items%20from%20X%20or%20Y%20to%20A%2FB%2FC.%3C%2FP%3E%3CP%3EOnce%20we%20move%20the%20items%2C%20there%20is%20no%20collective%20visibility%20on%20what%20is%20happening%20in%20X%20and%20Y.%3C%2FP%3E%3CP%3Eis%20there%20a%20way%20to%20get%20a%20collective%20sprint%20view%20of%20X%20and%20Y%20even%20after%20sending%20out%20the%20work%20to%20A%2C%20B%20and%20C.%20Keeping%20in%20mind%20that%20X%20team's%20work%20is%20non%20relevant%20to%20Y%20team's%20work%20so%20we%20need%20to%20segregate%20as%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3EOne%20sprint%20view%20as%20-%20X%20team's%20work%20%2B%20A%20team%20(Assigned%20by%20X)%20%2B%20B%20Team%20(Assigned%20work%20by%20X)%20%2B%20C%20Team%20(Assigned%20work%20by%20X)%3C%2FP%3E%3CP%3E%26nbsp%3B%3C%2FP%3E%3CP%3ESecond%20Sprint%20view%20as%20-%20Y%20team's%20work%20%2B%20A%20team%20(Assigned%20by%20Y)%20%2B%20B%20Team%20(Assigned%20work%20by%20Y)%20%2B%20C%20Team%20(Assigned%20work%20by%20Y)%3C%2FP%3E%3C%2FLINGO-BODY%3E
Occasional Visitor

I have two product teams X and Y and these product teams do work with Service teams A, B and C.

During planning we plan for Product team X and Y but later the work flows out to services team A, B and C. which means we change the area path and iteration of the work items from X or Y to A/B/C.

Once we move the items, there is no collective visibility on what is happening in X and Y.

is there a way to get a collective sprint view of X and Y even after sending out the work to A, B and C. Keeping in mind that X team's work is non relevant to Y team's work so we need to segregate as

 

One sprint view as - X team's work + A team (Assigned by X) + B Team (Assigned work by X) + C Team (Assigned work by X)

 

Second Sprint view as - Y team's work + A team (Assigned by Y) + B Team (Assigned work by Y) + C Team (Assigned work by Y)

0 Replies