Forum Discussion
Tasks change sort after Filtering
- Mar 04, 2024
The latest update for the desktop version of Project is: Version 2402 (build 17328.20142 CTR) released on Feb 28. I suggest you update although it won't change the issue you're posting about.
Why are all your tasks manually scheduled? In my view, is a user wants to use manual scheduling, they might just as well use Excel. Manual scheduling is only useful for initial rough draft planning. Once the plan's structure is in place, then all tasks should be auto-scheduled to take full advantage of Project's scheduling engine.
I'm a little confused about what you are doing. Sorting will re-order tasks based on the sort criteria although the outline structure can be kept if that option is selected in the Sort Window. Are you sorting and then applying the filter?
All three of your screen shots show some type of sort is applied. To remove that sort, re-sort by ID.
John
First of all, what version of Project are you using (i.e. desktop, Project Online, Project for the Web)?
What is your filter criteria (e.g. field, test and value)? How exactly do you "turn the filter on and off"?
When you say "timeline" are you referring to the Timeline view or the normal Gantt Chart timescale (i.e. graphic [right] side of the view)?
Screen shots of before and after would help us better understand what you see.
John
- Project Desktop
- Version 2312
- Criteria
- Task name
- duration
- start
- finish
- predecessor
- Text 1, which I changed to say Subcontractor
- I use the Gantt view
- See screen shot below. What I see happening is the program automatically sorts all my tasks from top down by start date, though I have all changed to "manually scheduled". Best way I can describe it, is I would like to keep the logic and restrict the tasks from reordering based on the logic.